Laserfiche WebLink
<br />C0962000out.txt <br /> <br />18.3 <br /> <br />9/25/2003 <br /> <br />USES AND LOSSES 1996 TO 2000 WATERSHED 14020006 OURAY <br />CONSUMPTIVg USE ESTIMATED FROM RIDGWAY 38 09' - TEMP AND PRECIP <br />USBR CROP DISTRIBUTION - PCT <br />EFFECTIVE PRECIPITATION (INCHES) <br />TYPE OF CROPPING = PROJECT CROPPING <br />Year JAN FEB MAR APR MAY JUN JUL AUG SEP . OCT NOV DEC <br />ANN <br /> 96 0,00 0.00 0,00 0,16 0,26 1. 20 1. 44 0.42 1.12 0.52 0.00 0,00 <br /> 5,12 <br />0 97 0.00 0.00 0.00 0.03 1. 48 1. 64 1. 05 2.04 1. 76 0.20 0.00 0.00 <br />'..J 8,20 <br />e- 98 0,00 0.00 0,00 0,00 0,00 0,05 2,14 0.93 1. 02 0.54 0.00 0.00 <br />'"'~, <br />en 4.68 <br />. 99 0,00 0,00 0.00 0,00 1. 01 1. 26 2.44 2,36 0.85 0.00 0,00 0.00 <br />""" 7,92 0,00 0.00 0,00 0.34 0,99 0,76 0.85 1. 87 0,99 0.36 0,00 0,00 <br /> 2000 <br /> 6,17 <br />Ave. 0.00 0,00 0.00 0.11 0.75 0.98 1. 58 1. 52 1.15 0.32 0,00 0.00 <br />6.4 <br /> <br />USES AND LOSSES 1996 TO 2000 WATERSHED 14020006 OURAY <br />CONSUMPTIVE USE ESTIMATED FROM RIDGWAY 38 09' - TEMP AND PRECIP <br />USBR CROP DrSTRIBUTION - PCT <br />NET IRRIGATrONCONSUMPTIVE USE (INCHES) <br />TYPE OF CROPPING = PROJECT CROPPING <br />Year JAN FEB MAR APR MAY JUN JUL AUG SEP OCT <br />ANN <br />96 0,00 0.00 0.00 0.29 2.96 2,66 3.04 3.60 1.16 0.00 <br />13,71 <br />97 0.00 0,00 0.00 0.02 1.13 2.28 3.27 1.80 0.87 0.45 <br />9.81 <br />98 0.00 0.00 0,00 0.00 2.47 3,15 2.70 3.07 1.81 0.17 <br />13,37 <br />99 0.00 0.00 0.00 0.00 1.07 2.14 2.23 1.44 1.31 0.52 <br />8.73 <br />2000 0.00 0.00 0.00 0.84 1.81 3,00 3.74 2.42 1,58 0.33 <br />13.73 <br />Ave, 0,00 0.00 0,00 0.23 1.89 2.65 2.99 2,47 1.35 0.30 <br />11.9 <br />D:\Cu196-00\Upper Co1orado\Co1orado\~g Back Up\C0962000out.txt <br />- Thursday, September 25, 2003 <br />USES AND LOSSES 1996 TO 2000 WATERSHED 14010004 PITKIN <br />CONSUMPTIVE USE ESTIMATED FROM MEREDITH - TEMP AND PRECIP <br />USBR CROP DISTRIBUTION - PCT <br />PROJECT CROPPING OUTPUT ONLY <br />YEARS ANALYZED FROM 1996 THROUGH 2000 <br />USES SCS EFFECTIVE PRECIPITATION METHOD <br /> <br />NOV DEC <br />0.00 0.00 <br />0.00 0,00 .'.j <br />0.00 0.00 <br />0.01 0,00 <br />0.00 0.00 <br />0.00 0,00 <br /> <br />NUMBER OF CROPS 8 <br /> CROP BEG END BEG END SEASON <br />CROP NAME NUMBER TEMP TEMP DATE DATE LENGTH <br /> (F) (F) (m/d) (m/d) (DAYS) <br />ALFALFA 1 50 28 1/ 1 12/31 365 <br />PASTURE 2 45 45 1/ 1 12/31 365 <br />PASTURE SHORT 1996 2 45 45 1/ 1 7/25 365 <br />PASTURE SHORT 1997 2 45 45 1/ 1 10/18 365 <br />PASTURE SHORT 1998 2 45 45 1/ 1 8/26 365 <br />PASTURE SHORT 1999 2 45 45 1/ 1 9/27 365 <br />PASTURE SHORT 2000 2 45 45 1/ 1 7/19 365 <br />GRAIN, SPRING 8 45 45 4/13 8/ 4 113 <br />PERCENTAGE OF DAYLIGHT HOURS PER MONTH <br /> 130 <br />