My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06806
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06806
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:26 PM
Creation date
10/12/2006 1:52:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.450
Description
McElmo Creek Unit - Colorado River Salinity Control Program
State
CO
Basin
Colorado Mainstem
Water Division
7
Date
5/1/1982
Title
Possible Improvements for Onfarm Irrigation Systems to Reduce Salinity
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MAY 1982 <br /> <br />Iable Al-2 <br />Regional fuvelopment Account 1/ <br />McEl.JID Creek Salinity O>ntrol StudY,- <blorado <br />($1,000 inCrenE11ts) <br /> <br /> I. Incone <br /> A. Beneficial Effects <br /> 1. ValLE of Goods and services <br /> a. Wann Benefits ($) 415.7 <br /> b. D::>w1stream Benefits ($) <br /> c. amstruction Labor ($) 87.8 <br /> d. Benefits durirg ($) 98.1 <br /> ins tallation period <br />. 2. Value of EXternal Econanies (S) 728.7 <br />, lbtal Beneficial Effects ($) 1330.3 <br /> <br />Plan 3 <br />I State of Rest of I <br />Colorado Nation <br /> <br />Plan 4 <br />I State of Rest of I <br />Colorado Nation <br /> <br />~5.6 <br /> <br />1224.0 <br /> <br />1887.0 <br /> <br />289.0 <br /> <br />168.9 <br />213.8 <br /> <br />445.5 <br /> <br />1587.5 <br /> <br />1513.0 <br /> <br />2875.8 <br /> <br />2332.5 <br /> <br />B. Adverse Effects <br />1. Implementation <bsts <br />a. Project Installatio~ (S) 256.0 860.3 <br />b. Project ldministration ($) 112.7 <br />c. cperation, l1rintenance ($) e <br />[, Replacanent 220.3 <br />d. <bsts durirg installation ($) <br />period:?! 109.5 205.4 <br /> <br />lbtal Adverse Effects 6/ <br /> <br />($) 585.8 <br /> <br />1178.4 <br /> <br />C. ~t Beneficial Effects <br /> <br />($) 744.5 <br /> <br />334.6 <br /> <br />II. ElnpIo}llJ'Ilt <br /> <br />A. Beneficial Effects <br /> 1. Increase in Jobs <br /> a. Sem1-skilled2/ 5.4 10.3 <br /> b. Unskilled2/ 58.1 111.7 <br /> c. ..wicultur~ <br />. 2. Decrease in Jobs <br /> a. ..w1cultur~ 1.1 17.2 <br />- <br /> <br />1/ <bsts..ere anortized at 7 5/8% for 25 years. July 1981 price lRse. <bsts and <br />benefits ...re COOlpUte:l in present valLE terms using 6-)Ear installation period. <br />Fiscal Year 1982 WRC crop prices used. <br />2/ Io.brk years. <br />3/ Io.brk year/year. <br />4/ Based 01 75 percent federal Q)st share for construction costs. <br />Y Includes interest on ClI.M and constructim cost and ClI.M costs during installation <br />period. <br />6/ N:> mitigation, archeological, or land rights costs are antici!>lted. <br /> <br />('~ <br />...C).J <br />~' )- <br />\j- <br />
The URL can be used to link to this page
Your browser does not support the video tag.