<br />MAY 1982
<br />
<br />Level of Federal Funding
<br />
<br />Federal cost-share rates to implement the recommended plan should be
<br />
<br />not greater than 75 percent. This 75 percent cost-share rate requires
<br />
<br />$23,325,000 in federal funds over the six year period, consisting of
<br />
<br />$17,490,000 cost-share assistance for construction, $5,835,00U for
<br />
<br />administrative and technical assistance.
<br />
<br />Annual levels of funding and total cost for the six-year installation
<br />
<br />period are shown in Table VI-2.
<br />
<br />.
<br />
<br />TABLE VI-2 ANNUAL LEVELS OF FUNDING NEEDED FOR IMPLENENTATlON.
<br />McELMO CREEK SALINITY CONTROL STUDY, COLORADO
<br />
<br />Construction
<br />
<br />Admin. & 1/
<br />Technical-
<br />
<br />Local
<br />
<br />Total
<br />
<br />Total
<br />
<br />To tal
<br />
<br />YeaI Federal Local Assistance O&M 2/ Federal Local Cost
<br /> - ------ - -- ---- ---$I,OOl -- --- ------ - ----
<br />I 2,915 972 972 30.7 3,887 1,002.7 4,889.7
<br />2 2,915 972 972 61.4 3,887 1,033.4 4,920.4
<br />3 2,915 972 972 92.1 3,887 1,064.1 4,951.1
<br />4 2,915 972 973 122.8 3,888 1,094.8 4,982.8
<br />5 2,915 972 973 153.5 3,888 1,125.5 5,013.5
<br />6 2,915 972 973 184.2 3,888 1, 15b. 2 5,044.2
<br />TOTAL 17,490 5,832 5,835 644.7 23,325 6476.7 29,801.7
<br />
<br />1/ Includes $295,00U ,annually to continue the following: $100,000 for an
<br />Irrigation Research Program by ARS, USDA; $45,000 for an Information and
<br />Education Program by ES, USDA: and $150,000 for Monitoring and Evaluating
<br />Results by SCS, USDA.
<br />
<br />.
<br />
<br />3../ Annual level of funding for O&M during implementation period. Following
<br />Implmentation Annual O&M Cost will remain at about $185,000.
<br />
<br />VI-3
<br />
<br />, - (' ()
<br />...O';,}...
<br />n,\' )..0
<br />\)-
<br />
|