Laserfiche WebLink
<br />Description of Plan Formulation <br /> <br />MAY 1982 <br /> <br />Onfarm salt loading is caused by seepage and deep percolation of <br /> <br />irrigation water into and through saline aquifers. Practices that can <br /> <br />reduce seepage and deep percolation and the associated salt load are <br /> <br />summarized in Table 11-1 and form the basis for plan formulation. <br /> <br />TABLE 11-1 SOURCE OF UNFARM SALT LOADING <br />AND PRACTICES FOR ATTAINING SALT LOAD REDUCTION. <br />McELMO CREEK SALINITY CUNTROL STUDY, COLORADO <br /> <br />'CAUSE <br /> <br />APPLICA6LE PRACTICES <br />MANAGEMENT STRUCTURAL <br /> <br />See page: <br />Onfarm ditches <br /> <br />Tailwater Runoff <br /> <br />Deep percolation and <br />non-uniform <br />application of <br />irrigation water <br /> <br />Inefficient layout of <br />fields and irrigation <br />systems. <br /> <br />Adjust the time of set, <br />number and frequency of <br />irrigations. <br /> <br />Adjust the flow rate, <br />the time of set, the <br />number and frequency <br />of irrigations. Change <br />to more efficient method <br />of irrigation. <br /> <br />Adjust the number of <br />irrigations, the time of <br />set, and flow rate. <br />Change to more efficient <br />method of irrigation. <br /> <br />Combine fields or change <br />to more efficent method <br />of irrigation. <br /> <br />II-6 <br /> <br />Install ditch lining or <br />pipelines and <br />appurtenant structures. <br /> <br />Install lined and un- <br />lined tailwater <br />collection ditches or <br />lined ponds. <br /> <br />Install water measuring <br />devices, land smoothing, <br />and automated timing <br />devices. Change to <br />border, drip or <br />sprinkler methods of <br />irrigation. <br /> <br />Close existing open <br />drains. Relocate <br />pipelines and ditches. <br />Change to border, <br />drip or sprinkler <br />methods of irrigation. <br /> <br />S"n <br />r\ (\ 4 \.i';' <br />\,) '- j, <br />