Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br /> Table 9.--Projected M&I water requirements, supplies and shortages, <br /> Fort Collins, Colorado <br /> Years <br /> Item 1970 1980 1990 2000 2010 2020 2025 <br /> Population 48,000 80,900 ll4,ooo l48,000 192,000 250,000 283,000 <br /> Requirements: <br /> Daily per capita, gals. 250 250 250 250 250 250 250 <br /> Annual per capita, ac. - ft. 0.28 0.28 0.28 0.28 0.28 0.28 0.28 <br /> Total annual,' ac.-ft. l3,400 22,700 3l,900 4l,400 53,800 70,000 79,200 <br />j\) Annual supplies: <br />w. <br /> Existing rights, ac.-ft. ~ 23,400 23,400 23,400 23,400 23,400 23,400 23,400 <br /> Converted rights, ac.-ft. EI 3,600 8,800 l4,200 19,400 26,400 35,600 40,800 <br /> Total, ac.-ft. 27,000 32,200 37,600 42,800 49,800 59,000 64,200 <br /> Annual shortages ac.-ft. 0 0 0 0 4,000 ll,OOO 19,000 <br /> ~ Derivation shown in table 5. <br /> EI Existing agricultural rights to be acquired by city under annexation policy. <br /> <br />