Laserfiche WebLink
<br />cDSS Updates <br />I. CRDSS <br /> <br />. Irrigaled Acreage Refresh. Contractor selected and contract is being <br />processed, Proposed to be completed by end of calendar year 200 I. <br /> <br />. Testing and checking of new StateMod software (variable efficiencies/soil <br />moisture) on the Yampa River. Being carried out by consultant, LRcWE. <br /> <br />. Testing of Ihe advantages of using a daily model versus the use of monthly <br />model output and desegregating to daily. Being carried out by consullant, <br />Boyle. <br /> <br />. Getting the existing GIS data in a better format, similar to the Rio Grande. A <br />consultant under a P.O. will do this, Currently awaiting EDO approval. To be <br />done by RTi, <br /> <br />. Training of Carolyn in the use of ArcView 3D Analysts as a way of presenting <br />DSS data which is easier to understand. A consultant, HDR, will do training. <br /> <br />. Updating the White River Basin Phase IIIa model to include the same <br />enhancements done for the olher basin models. A consuItanl will complete <br />this updating, Bishop-Brogden has been contacted to submit a SOW. <br /> <br />. Meeting with ISF Section to identify what part of their program/database can <br />be incorporated in cDSS. <br />2. RGDSS <br /> <br />. Andy or Ray B. will update. <br />3. SPDSS <br /> <br />. Draft Feasibility Study has been sent to core group for reyiew and comment. <br />A meeting is scheduled for June 26, 2001 at 1:00 PM to begin gelling <br />feedback. <br /> <br /> <br />OQi132'r <br /> <br />DSS Agenda <br /><;,.;il' /ZOO, <br /> <br />Sbort Term Objectives <br />I. Complete the west slopes irrigated acreage refresh and have a well-documenled <br />process Ihat can be used in future refreshes. <br />2. Have a documented cost of acreage refresh Ihal can be used in establishing future <br />DSS O/M overall cost estimates, <br />3. Position paper on the value of using a daily model for planning purposes and a <br />recommendation on applying a daily to the other models. <br />4, Have a well-documented process on moving from monthly model to daily <br />modeling. <br />5. Verification that the new version of State Mod is working as intended. <br />6, Position on the modification of the existing cRDSS models using the enhanced <br />StateMod. This position may recommend that consultants do the modifications, <br />7. Modification of Ihe exisling Phase lIIb Gunnison model to include variable <br />efficiencieslsoil moisture and the modifications to irrigated acreage by Ihe Upper <br />Gunnison prior to NPS/FWS modeling, <br />8. Completion of the White River Phase lIIb model. <br />