Laserfiche WebLink
<br />The sampling schedule for 1999 is tentatively planned for the period mid-March thru the <br />end of June. A detailed progress report for the 1998 data when it is received from the <br />lab. <br /> <br />VII. Recommendations: Continue to collect data es recommended by the per review panel. <br /> <br />VIII. Project Status: Ongoing, the current study runs from 1998 to 2001. <br /> <br />IX. FY -98 Budget: <br /> <br />A. ,Funds Provided: $31,600 <br />B. Funds Expended: $31.600 <br />C. Difference: $ 0 All funds were expended in 1998. <br /> <br />The USGS hes provided $25.000 of match for this ~roject to do additional analysis and <br />correlations with data collected earlier in the century. <br /> <br />X. Status of Data Submission: Not applicable, 1998 was the first year of the project and <br />no formal reports are required. A summery report of the data will be made available <br />when the USGS lab has finished analyzing the sediment data. <br /> <br />XI. Signed: George Smith for Ed Vail <br />Principal Investigator <br />W:\UCllS\REP0RTS\9llREPOR1I8BYSED,ReP <br /> <br />Decembf!r 8. 199B <br />Date <br />