Laserfiche WebLink
<br /> <br /> Table 3.-Colorado River Basin depletion projeclions <br />N (Unit: 1,000 aflyr) <br /> 1990 2000 2010 2020 2030 2040 2050 2060+ <br />(J' <br />-.1 <br />t-" ARIZONA (UPPER BASINI <br /> 1965 Framework Sludy 10 10 10 10 10 10 10 10 <br /> 1966-90 changes <br /> Irrigallon 5 3 5 5 5 5 5 5 <br /> Municipal and industrial 5 3 6 6 6 6 6 6 <br /> Navajo Powerplant 22 22 22 22 22 22 22 22 <br /> Gallup-Navajo Indian Water Supply projecl 0 7 7 7 7 7 7 7 <br /> T olal scheduled depletion 42 45 50 50 50 50 50 50 <br /> State share 01 6,0 mal 50 50 50 50 50 50 50 50 <br /> Remaining available 8 5 0 0 0 0 0 0 <br /> Percent 01 Stale share 16 10 0 0 0 0 0 0 <br /> COLORADO <br /> 1990 levei 01 development <br /> 1965 Framework Study 1.707 1,707 1,707 1.707 1.707 1,707 1,707 1,707 <br /> 1966-90 changes <br /> Agricultural <br /> Bostwick Park 4 4 4 4 4 4 4 4 <br /> Silt 4 4 4 4 4 4 4 4 <br /> Dallas Creek 5 5 5 5 5 5 5 5 <br /> Dolores 32 32 32 32 32 32 32 32 <br /> StagecoachlYamcolo 4 4 4 4 4 4 4 4 <br /> Exports 10 10 10 10 10 10 10 10 <br /> Miscellaneous 24 24 24 24 24 24 24 24 <br /> Municipal/domestic <br /> Dallas Creek 2 2 2 2 2 2 2 2 <br /> Dolores 5 5 5 5 5 5 5 5 <br /> StagecoachlY amcolo 1 1 1 1 1 1 1 1 <br /> Tayior Draw 2 2 2 2 2 2 2 2 <br /> Exports 187 187 187 187 187 187 187 187 <br /> Miscellaneous 6 6 6 6 6 6 6 6 <br /> Power/lnduslrial <br /> Craig/Hayden 13 13 13 13 13 13 13 13 <br /> Tri.State (Colorado Ute) 1 1 1 1 1 1 1 1 <br /> Induslrial <br /> Blue Mesa 5 5 5 5 5 5 5 5 <br /> Green Mountain 2 2 2 2 2 2 2 2 <br /> Ruedi 2 2 2 2 2 2 2 2 <br /> Minerals <br /> Blueslone 4 4 4 4 4 4 4 4 <br /> Other <br /> Upper Gunnison Basin 5 5 5 5 5 5 5 5 <br /> Miscellaneous 2 2 2 2 2 2 2 2 <br /> Total 1990 level 2,027 2,027 2,027 2,027 2.027 2,027 2,027 2,027 <br /> Anticipated depletions <br /> Agricullural <br /> Silt 0 1 1 1 1 1 1 1 <br /> Dolores 0 13 40 40 40 40 40 40 <br /> <br />18 <br />