|
<br />00
<br />
<br />(X)
<br /><.'\2
<br />(7:)
<br />r:':;'
<br />
<br />NMPM, Colorado, and sections 34 and 35 T. 42 N., R. 10 E., NMPM, Colorado, as
<br />shown on United States Department of the Interior, Bureau of Land Management
<br />dependent resurvey plat of T. 41 N., R. 10 E., NMPM, Colorado, dated August 16,
<br />1983, bears N 210 26' 48" E, 718.63 feet; thence N 840 03' 23" W, along the north
<br />line of Parcel 2019-4 PE, 100 feet; thence N 5" 56' 37" E, 20 feet; thence S S4"
<br />03' 23" E, 100 feet; thence S 50 56' 37" W, 20 feet the point and place of
<br />beginning. Parcel OP-14 PE contains 2,000 FT2 (0.05 acres), more or less.
<br />
<br />Parcel Of-IS PE is an electric transmission power line pole guy wire and anchor
<br />easement located in the ~ section 23, T. 42 N., R. 10 E., NMPM, Colorado,
<br />and as shown on Plat Drawing Number 1298-538-924, being more particularly
<br />described as follows:
<br />
<br />Beginning at the point of intersection of the north line of Parcel 2160 PE,
<br />described in this schedule, and the east line of Parcel SW-132 PE, which is the
<br />north-south line between sections 22 and 23, also described in this schedule,
<br />whenoe the corner common to sections 14, 15, 22, and 23, T. 42 N., R. 10 E.,
<br />NMPM, COlorado, as shown on United States Department of the Interior, Bureau of
<br />Land Management corrective dependent resurvey plat of T. 42 N., R. 10 E., NMPM,
<br />Colorado, dated October 4, 1984, bears N I" 44' 37" E, 495.75 feet; thence N 64"
<br />36' 04" E, along the north line of Parcel 2160 PE, 70 feet; thence N 25" 23' 56"
<br />W, 35 feet; thence S 640 36' 04t1 w, 52.06 feet to a point on the east line of
<br />Parcel SW-132 FE, which is also the north-south section line between sections
<br />22 and 23; thence S 10 44' 37" W, along the east line of Parcel 132 PE, which
<br />is the north-south section line between sections 22 and 23, 39.33 feet to the
<br />point and place of beginning. Parcel OP-15 PE contains 2,136 FT' (0.05 acres),
<br />more or less.
<br />
<br />Parcel OP-16 PE is an electric transmission power line pole guy wire and anchor
<br />easement located in the NE~ section 24, T. 41 N., R. 10 E.,NMPM, Colorado, and
<br />as shown on Plat Drawing Number 1298-538-900, being more particularly
<br />described as follows:
<br />
<br />Beginning at a point on the south line of Parcel 1850 PE, described in this
<br />schedule, whence the corner common to sections 13 and 24, T. 41 N., R. 10 E,
<br />NMPM, Colorado, and sections 18 and 19, T. 41 No, Ro 11 E., NMPM, Colorado, as
<br />shown on United States Department of the Interior, Bureau of Land Management
<br />dependent resurvey plats of To 41 No, R. 10 Eo, NMPM, Colorado, dated August
<br />16, 19S3, and T. 41 N., R. 11 E., NMPM, Colorado, dated April 12, 1983, bears
<br />N 42" 13' 51" E, 1,903.74 feet; thence S 2" 41' 09" W, 20 feet; thence N 87"
<br />18' 51" w, 51.32 feet; thence N 79" 45' 21" W, 51.32 feet; thence N 10" 14' 39"
<br />E, 20 feet, to a point on the south line of Parcel 1850 PE; thence S 790 45' 21"
<br />E, along the south line of Parcel 1850 PE, 50 feet; thence S 87" 18' 51" E, along
<br />the south line of Parcel 1850 PE, 50 feet to the point and place of beginning.
<br />Parcel OP-16 PE contains 2,026 FT' (0.05 acres), more or less.
<br />
<br />Parcel OP-I? PE is an electric transmission power line pole guy wire and anchor
<br />easement located in the SE~SE~ section 3, T. 41 N., R. 10 E.,NMPM, Colorado,
<br />and as shown on Plat Drawing Number 1298-538-165, being more particularly
<br />described as follows:
<br />
<br />Beginning at a point on the east line of Parcel 4-PE, described in this schedule,
<br />whence the corner common to sections 2, 3, 10, and 11, as shown on United States
<br />Department of the Interior, Bureau of Land Management dependent resurvey plat
<br />of T. 41 N., R. 10 E., NMPM, Colorado, dated August 16, 1983, bears S 60" 31'
<br />56" E, 830021 feet; thence N 60 09' 01" W, along the east right-of-way line of
<br />
|