<br />UJ
<br />
<br />described as follows:
<br />
<br />00
<br /><"'.1
<br />(:-~
<br />(:,:)
<br />
<br />Beginning at the point of intersection of the west line of Parcel SW-ll1 PE,
<br />described in this schedule, and the north line of Parcel 1948-2 PE, also
<br />described in this schedule, whence the closing corner for sections 1 and 12 on
<br />the west boundary line of the Luis Maria Baca Grant No.4, as shown on United
<br />States Department of the Interior, Bureau of Land Management dependent resurvey
<br />plat of T. 41 N., R. 10 E., NMPM, Colorado, dated August 16, 1983, bears N 9'
<br />17' 16" E, 1,348.00 feet and also whence the NW corner of Parcel SW-111 PE bears
<br />N 0' 14' 01" E, along the west line of Parcel SW-lll PE, 54.16 feet; thence N
<br />00 14' 01" E, along the west line of Parcel SW-l11 PE, 20 feet; thence S 880 37'
<br />04" W, 149.23, feet to a point on the north line of Parcel 1948-2 PE; thence S
<br />83' 44' 19" E, along the north line of Parcel 1948-2 PE, 150 feet to the point
<br />and place of beginning. Parcel OP-4 PE contains 1,489 FT' (0.03 acres), more or
<br />less.
<br />
<br />Parcel OP-5 PE is an electric transmission power line pole guy wire and anchor
<br />easement located in the NE~ section 14, T. 41 N., R. 10 E., NMPM, Colorado, and
<br />as shown on Plat Drawing Number 1298-538-904, being more particularly
<br />described as follows:
<br />
<br />Beginning at a point on the north line of Parcel 1891-5 PE, described in this
<br />schedule, whence the corner common to sections 13, 14, 23, and 24, as shown on
<br />United States Department of the Interior, Bureau of Land Management dependent
<br />resurvey plat of T. 41 N., R. 10 E., NMPM, Colorado, dated August 16, 1983,
<br />bears S 160 51' 41" E, 4,038.78 feet; thence N 63' 10' 44" E, along the north
<br />line of Parcel 1891-5 PE, 100 feet; thence N 26' 49' 16" W, 20 feet; thence S
<br />63' 10' 44" W, 100 feet; thence S 26' 49' 16" E, 20 feet to the point and place
<br />of beginning. Parcel OP-5 PE contains 2,000 FT2 (0.05 acres), more or less.
<br />I
<br />
<br />Parcel OP-6 PE is an electric transmission power line pole guy wire and anchor
<br />easement located in the NE~ section 14, T. 41 N., R. 10 E., NMPM, Colorado, and
<br />as shown on Plat Drawing Number 1298-538-904, being more particularly described
<br />as follows:
<br />
<br />Beginning at the point of intersection of the south line of Parcel 1891-4 PE,
<br />described in this schedule, and the east line of Parcel SW-I06 fE, also described
<br />in this schedule, whence the corner common to sections 11, 12, 13, and 14, as
<br />shown on United States Department of the Interior, Bureau of Land Management
<br />dependent resurvey plat of T. 41 N., R. 10 E., NMPM, Colorado,. dated August 16,
<br />1983, bears N 370 03' 40" E, 1,723.91; thence S 790 20' 05" E, along the south
<br />line of Parcel 1891-4 PE, 350 feet; thence N S6' 44' 17" W, 344.17 feet to the
<br />SE corner of Parcel SW-I06 PE; thence N 0' 17' 16" E, along the east line of
<br />Parcel SW-I06 PE, 40.67 feet to the point and place of beginning. Parcel oP-
<br />6 PE contains 7,774 FT' (0.18 acres), more or less.
<br />
<br />Parcel OP-7 FE is an electric transmission power line pole guy wire and anchor
<br />easement located in the NE~ section 13, T. 41 N., R. 10 E., NMPM, Colorado, and
<br />as shown on Plat Drawing Number 1298-53S-903, being more particularly described
<br />as follows:
<br />
<br />Beginning at a point on the south line of Parcel 1891-4 PE, described in this
<br />schedule, whence the corner common to sections 13, 14, 23, and 24, as shown on
<br />United States Department of the Interior, Bureau of Land Management dependent
<br />resurvey plat of T. 41 N., R. 10 E., NMPM, Colorado, dated August 16, 1983,
<br />bears S 520 58' 07" W, 3,606.44 feet; thence S 790 20' 05" E, along the south
<br />
|