Laserfiche WebLink
<br />..v <br /> <br />COLORADO RIVER INDIAN RESERVATION ~ ARIZONA <br /> <br />I"~ <br />""Q <br />i-'- <br />~ <br /> <br />Data available indicates this unit is not a significant contributor to <br />the salt problem in the Colorado River. Therefore, the USDA study underway <br />is being performed with irrigation water management as the primary <br />objective rather than salinity control. It is a USDA Cooperative River <br />Basin Study carried out under Sec. 6 of Public Law 83-566, at the request <br />of the Tribal Council and the Parker Valley Natural Resource Conservation <br />District. <br /> <br />SCS's basic data collection is progressing on schedule. The soil survey <br />is about 15% complete. Onfarm water measuring weirs to determine <br />irrigation effiencies have been installed. Weirs to measure project <br />spills have been installed at 30 sites. <br /> <br />LITTLE COLORADO RIVER BASIN - ARIZONA AND NEW MEXICO <br /> <br />This study is also being performed as a USDA Cooperative River Basin <br />Study under Sec. 6 of Public Law 83-566, in response to requests from the <br />Arizona Water Commission, the New Mexico State Engineer's Office, and the <br />involved Natural Resource Conservation Districts in the Basin. If the <br />study shows significant potential for salinity control, then a separate <br />salinity control report will be issued by USDA, To date the study shows <br />that salt loading from range and irrigated land in the Basin is quite <br />small. The study report is scheduled to be completed in March 1981. <br /> <br />PALO VERDE - CALIFORNIA <br /> <br />No change in status, <br /> <br />WPRS has not yet reached a decision on whether to proceed with a study on <br />the Palo Verde Unit, pending the completion of an EPA-funded 208 water <br />quality study. SCS's agreement with WPRS is to proceed with a study when <br />they initiate theirs. <br /> <br />DIRTY DEVIL RIVER - UTAH <br /> <br />No work has been done on this unit and preparation of a plan of study has <br />been indefinitely delayed. <br /> <br />LYMAN - WYOMING <br /> <br />Salinity prOblems and potential solutions were reviewed onsite. <br />Preliminary evaluation of the prOblems and the poor potential to arrive <br />at a viable solution have placed this proposed study in a "schedule <br />delayed" category. Final decisions as to what can be done in Big Sandy <br />need to be reached before proceeding with this study. No activity is <br />anticipated during the next 6 months. <br /> <br />HENRY'S FORK - MANILA - WYOMING <br /> <br />. <br /> <br />This study remains in the "not scheduled" category pending decisions on <br />the Big Sandy and the Lyman Units. <br /> <br />ROARING FORK - COLORADO <br /> <br />, <br /> <br />This study remains in the "not scheduled" category. <br /> <br />_"i"~- <br /> <br />I <br />11 <br />',',,,,.' <br />.t&. i:"-,i,~i~:ii ,"~,' ;'~k~-j <br />