My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06733
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06733
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:08 PM
Creation date
10/12/2006 1:50:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8107
Description
Arkansas River Basin General Publications-Issues
State
CO
Basin
Arkansas
Water Division
2
Date
12/1/1921
Author
H D Amsley
Title
Seepage Investigation on Arkansas River - October 5-16 and November 9-15 1921
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />III~~ <br /> <br />032482 <br /> <br />Thi8 seotion showed a small gain whioh was seepage from <br />the Bufff;l.lo Ditch. <br /> <br />'!he seepage invest:1~atbns were disoonUoued at this till18 <br />to be continued after B 8UIVey of the I:anslJ,s Reservoir site 6 <br />miles below Coolidge, Kansas had been made. <br /> <br />SeotionSeYen, Ootober 16th, 1921. <br /> <br />We left Holly Bnd drave tci Syraouse. Kansas. "IIbere the rivel' <br />wqs msasured and then to the Amason CarJlli which we gaged Q t the <br />rating station. <br /> <br />The am.urit in the Great Eastern Canal was estimated as 1.0 S.F. <br /> <br />We attempted to ford the rivor fIt 1lit.r'tlllnd and me.de about ball <br />the distanoe all right.. WOO" the 'wlwels sank ioto the sand lIC <br />doe>ep that ~e could ,'.ot ~o further wi thcut help. I.pl'osured a roan <br />and team to pull the car out. We we.l~e lll\.kio{S he"dway and had turned <br />around and started back w\.U!i Mr. Baily called to stop. The radius <br />rod ballhB.d pulled out of .tho socket. It was neaessary for !lie t.o <br />"get out . and.. got ~der" in 'the. sand and .1I'ater' and l'eplllce the part <br />with the aid of Mr. Baily and th.e teamster.. We finally repairGd <br />th.. car and "'er.o pulled out. '. . <br /> <br />I'Ml.lked aver to the South Sid.e Ditoh QEd it was dry. <br />TheA,*iver was mea~ured at' Hnrtland. completing Seotioll Seven. <br /> <br />We continued <br />wi th tile engir..e. <br />managed to get to <br />and than drove to <br /> <br />down tl10 rive.r for e. f~ miles and .,ievelopod trouble <br />,H'ter rUiw1ng on "thro.." for f' i'eo-", .rniles 'We <br />lakin, Knnsas. where We h"d the engine repaired <br />Garden City, arriving 9.t 9 :BO P..I. <br /> <br />Seotion Ei~ht. October 16, 1921. <br /> <br />'fh.. ,-iver _6 measured at Garden City and then the Farl!\ara <br />Ditoh wns r;aged about three JIli1li's below the headgat.e. The <br />Garden City Ditch whioh parallels the I/'armara at this point, mss <br />eati!\tlted BS running 0.7 S.F. <br /> <br />This completed the soopBfe measurements. We returned to lamar <br />that night and on the 17th made measurements on the river at In <br />Junta Elf.d the Ft. Lucns Ca"nl,reaohing Pueblo in the evening. <br /> <br />6. <br />
The URL can be used to link to this page
Your browser does not support the video tag.