My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06711
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:01 PM
Creation date
10/12/2006 1:50:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
2/7/1992
Author
Unknown
Title
Yampa River Feasibility Study - Progress Reports - February 1992 through April 1995
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00142(1 <br /> <br />. <br /> <br />. <br /> <br />ff~ <br />/{l\SC -r~-- <br />I F-- --,.---)-~~< .~-_. <br />I <br />L <br />E <br /> <br />. <br /> <br />MEMORANDUM <br /> <br />TO: <br />FROM: <br />SUBJECT: <br />DATE: <br /> <br />Ray Tenney <br />Chuck Brendecke <br />Progress Report for October - Yampa Basin Study <br />November 10. 1992 <br /> <br /> <br />~ LJ, <br />/~~' <br />cz. 3',... \ <br />Cl?<<::J: \ \ <br />% .?/~ I <br /> <br />"r 1~. 'if;; J/ <br />In Task 1, we participated in a Technical Steering Group (I'SG) meeting on 0 .,.., fY. <br />A memorandum summarizing the meeting was prepared and distributed to the TSG on . \, er . < <br />19. At this point we have exceeded our Task 1 budget by $524.90 and need to discuss how/ <br />handle the remaining coordination activities. <br /> <br />Our work effort in October was directed at Tasks 1, 7, 9, 10, and 11. <br /> <br />In Task 7, we revised certain portions of the Task 7 Technical Memorandum based on <br />comments of the TSG at the October 16 meeting. These revised sections were mailed to the <br />commenting TSG members. I do not anticipate any further billing against Task 7 so the <br />current overrun of $3,238.05 should be final. I would suggest that the monies remaining on <br />the Task 3 and 5 budgets (a total of $3,667.93) be reallocated to cover this overrun. <br /> <br />In Task 9, we have been preparing and executing a number of revised model runs based <br />on the revised Task 9 scope and instructions of the TSG. These additional model runs are <br />nearly complete and documentation of the results will be mailed to the TSG shortly. <br /> <br />In Task 10, we have been working on the overall project development s<;hedule, <br />integrating design and construction tasks with permitting and environmental assessment tasks. <br />We have begun revising cost estimates for the enlarged Elkhead and Stagecoach reservoirs. <br /> <br />In Task 11, we have continued work ort preparationof the draft study report. Several <br />chapters have been reformatted and edited and are currently undergoing independent internal <br />review. <br /> <br />Please feel free to call if you have any questions or comments on our October work <br />effort. <br /> <br />cc: Sue Uppendahl <br />Bob Norman <br /> <br />Hydrosphere Resource Consultants 1002 Walnut Suite 200 Boulder, Colorado 80302 <br /> <br />L.."l'flO~lM\TAR:'\MEIII05"RDTCREAla):HOVl!"OO~ 10. ltll::l":;llI_ PAlNn!): No_ 10.1":14:23 PM <br /> <br />,,t.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.