My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06711
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:24:01 PM
Creation date
10/12/2006 1:50:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
2/7/1992
Author
Unknown
Title
Yampa River Feasibility Study - Progress Reports - February 1992 through April 1995
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0014 11 <br /> <br />. <br /> <br /> <br />~ <br /> <br />TO: <br />FROM: <br />SUBJECT: <br />DATE: <br /> <br />Ray Tenney <br />Chuck Brendecke <br />Progress Report for August - Yampa Basin Study <br />September 4, 1992 <br /> <br />DIR ./ <br />se 'V <br />, ASC <br />i F <br />I <br />L <br />E i <br /> <br />Our work effort in August was directed mainly at Tasks 7 and 11. <br /> <br />In Task 7, our largest effort was in preparation of the draft Task 7 Technical <br />Memorandum. We had some meetings with our subs in this regard and they also did some <br />review and writing. In additIon we investigated the Elk Creek gravity feed concept and did a ' <br />model run to assess the effects of moving the Contemplated Draft call to below the Maybell <br />Canal. <br /> <br />In Task 11 we have been reassembling our Task Technical Memoranda into a first draft <br />of the final study report, We now have first drafts of the first five chapters of the report. We <br />have recently hired a new graphics technician who will be helping us produce some better <br />maps and diagrams for the report. <br /> <br />Billing to Task 9 and 10 mainly reflects working with Doug Laiho and Bill Miller to <br />coordinate the work efforts for those tasks. <br /> <br />We have now slightly exceeded our Task 7 budget and are close to exceeding our Task 1 <br />budget. However, with the exception of another public meeting in Craig, I think the future <br />charges to those tasks could be covered by the roughly $3600 that is left in the Task 3 and 5 <br />budgets. <br /> <br />Please feel free to give me a call if you have any questions or comments on our August <br />work effort, <br /> <br />cc: Sue Uppendahl <br />Bob Norman <br /> <br />Hydrosphere Resource Consultants 1002 Walnut Suite 200 Boulder, Colorado 80302 <br /> <br />~"MO~l;CTS\155\T...s(1\MEM051.Aore"eAI1!D: sene..ge".. 'ut ".9 PM ~"'Nn-O: s.",....... 4. 'U2 3:30 P" <br /> <br />],k ",LJ: <br />
The URL can be used to link to this page
Your browser does not support the video tag.