Laserfiche WebLink
<br /> <br />. <br /> <br />'. <br />. <br /> <br />. <br /> <br />., <br /> <br />l" <br /> <br />. <br /> <br />I <br /> <br />. <br /> <br />w <br />I\;; <br />A <br />-..J <br /> <br />impllct8 to in!lur~ the most environmelltally acceptable approach. Further <br />work ",lll he dont~ Oil Jesign and cost estimating. and the development <br />of a benefit cost ratio to completely determine the feasibility of the <br />proJect. <br /> <br />Once the most feasible p13n is decld~d upon, field surveys 1.1111 be <br />required fOr construction sites, pipeline alignments and storage <br />sites for the remaining brine product. At the end of this stage, a <br />Hnal report on the findings of the studies inCluding reCOrmlendationa <br />for actual construction or further studie. will be written. <br /> <br />36 <br /> <br />