<br />
<br />.
<br />
<br />.
<br />
<br />w
<br />1\;)
<br />"'"
<br />(.oJ
<br />
<br />A ':'('vi..,..... of th~ D~.:;.'lltinr.. \I.1nclb"ok fa..' PLlOncrs indic.1to.ld the };ulti:;t."I~c
<br />FIOl.,h ::Ii.:;t111.:1t1011 proceSS b..::.;t met the ovcrall rcqulrcllIcnlo!:. i.o'. tlc:;.~.lting
<br />Ji:...:h..r~c.:; (.om the Dotl;';'.o anJ Glcn....ooJ S:>rings .:Ire,).:>. Dr,")w':'n~ on the
<br />h.m..ibol0k (01,- the coStS .:!ssoci.'l.t.cd with the dC.::>alin;.tion facil~ty .1.100(;
<br />...;it:. the c.:;ti.m.:J.tcs ot plp,,"li:1c installati.on costs u::;cd 1n cu.rent Bu:"c;)u
<br />of Rccl.:.m..cion pl.:mning, a rccoanaissancc cost estimate w.J.u rr.aclc of the
<br />plans cOllsidcrcJ for t.catina the saline dlscharsc6. The cOStS of these
<br />plans, indexed to July 1972 follow.
<br />
<br />E:;cilMccd COSt
<br />
<br />Des.,Unatioo
<br />(J{ c.Lo.)
<br />'7
<br />
<br />of DotGcro Discharges only
<br />
<br />Item
<br />
<br />Co:>t
<br />$9.)~4.000
<br />439,000
<br />1,030,000
<br />99,000
<br />1,061.. QDD
<br />372,000
<br />111,000
<br />333,000
<br />130,000
<br />138,000
<br />
<br />:-:u:tis::.:lz,c iLsh process plant
<br />Intake and discharge lines
<br />Stc~m Generators
<br />Cooling Tower
<br />:vaporation Pond
<br />Sitc D~velopmcnt
<br />Co:~~Ction Systcm
<br />Pipelincs
<br />Cooling Pond
<br />Land
<br />
<br />Total
<br />
<br />$13,310,000
<br />
<br />Annual opcration, maintenance, and
<br />Replaccment COStS
<br />
<br />$ 2,400,000
<br />
<br />Estimated Costs
<br />
<br />Desalination of Glenwood Springs Dischargcs Only
<br />
<br />(9 c.f.s.)
<br />Itcr.1
<br />}:ultistagc flash ?roccGs plant
<br />Int~~e and discharge lines
<br />Stc,:J.J;l Gcr.crators
<br />Coolinz to.....cr
<br />Ev~?ora~ion Pond
<br />Sitc Gcvclop~ent
<br />Col~cc~ion System
<br />?ipdines
<br />cooling pond
<br />una
<br />
<br />Co::;t
<br />$14,600,000
<br />695,000
<br />1,53~,OOO
<br />150,000
<br />1,703,000
<br />520,000
<br />l.10.000
<br />2,223,000
<br />156,OCO
<br />253,000
<br />
<br />Total
<br />
<br />$22,244,000
<br />
<br />Annual operation, ~intenance, and
<br />rcp14cc~nt costs
<br />
<br />$ 3,800,000
<br />
<br />32.
<br />
|