<br />Estimates of Salinity Control Potential-January 1986'
<br /> Projected Est Salt Annual ~181
<br /> Salt Reduction Cost
<br /> Reduction to date Effectiveness
<br />Unit and Agency k !on/yr k ton/yr $/ton Status
<br />Palo Verde Irrig Dist CA, BRI USDA II II Under investigation
<br />Sinbad Valley CO, BLM 1,410 101 Ad'vance planning to begin 1988
<br />Meeker Dome CO, BR 19,000 19,000 14 Completed during verif studies
<br />Grand Valley, Stage One CO, BR 24,000 \9,900 123 Construction complete
<br />,Stage Two, BR 120,300 93 Preconstruction planning
<br />Stage Two Balance, BR 23,200 291
<br />USDA 230,000 27,300 23 U oder construction
<br />Paradox Valley CO, BR 180,000 32 Preconstruction planning
<br />Lower Gunnison Stage I WW CO, BR 14,300 t7 Preconstruction planning
<br />Stage I Deferred, BR 66,300 \83
<br />North Fork, BR II II Under investigation
<br />USDA 335,000 32 Plan complete; plan to rescape
<br />Dolores Project (McElmo) CO, BR 23,420 89 Preconstruction planning
<br />McElmo Creek CO, USDA 38,000 67 Extended to future yr>
<br />G1enwood-Dotsero Springs CO, BR 287,000 109 Deferred
<br />Mancos CO. USDA 8,800 56 Planning complete
<br />Lower Virgin NV, BR 270,000 21 69 Under investigation
<br />Virgin Valley, NV-AZ, USDA 37,200 16 Planning complete, pending funding
<br />Moapa Valley NV, USDA t9,500 35 Plan complete, pending funding
<br />Las Vegas Wash Stg I, Pittman, BR 7,000 7,000 24 Construction complete
<br />Stage I, Whitney, BR 10,000 21 16 Verification studies underway
<br />Stage II, BR 66.000 21 17 Under reformulation
<br />San Juan River NM, BR 11 II Under investigation
<br />Uinta Basin Stage One UT. BR 25,500 85 Planning complete
<br />Stage Two, BR II II Under construction
<br />USDA 98,200 31 15,600 59 Under construction
<br />Price-San Rafael UT, BR 22,000 47 Considering new combined alternative
<br />Price-San Rafael UT, USDA II II 111vestigations ul1derway
<br />Dirty Devil UT, BR 20,600 97 Planning complete
<br />Big Sandy River WY, BR II II Reformulation studies
<br />USDA 52,900 31 25 Based on off.farm canal lining and
<br /> onfarm low pressure alternative
<br />
<br />. An figUres are from thc"198S Evaluation of Salinity Control Programs in the Colorado River Basin and dollars used to figure cost
<br />effectivel1ess have been adjusted to reflect 1984 dollars and 8-3/8 percent interest.
<br />
<br />1/ Studies have not progressed far enough to mak.e estimates.
<br />2/ Best estimates at this time.
<br />3/ Revised estimates that differ from published USDA reports because of new information and data now available.