Laserfiche WebLink
<br />. <br /> <br />, <br /> <br />J <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br />. <br /> <br />Some savings probably could be achieved by combining <br />various alternatives with synergistic effects or by <br />combining the use of drainwater and fresh water to <br />meet industrial needs (e.g. combined conventional and <br />BCT cooling at Wellington could permit developing the <br />full 1,600 MW of planned capacity). <br /> <br />II <br /> <br />4. <br /> <br />RECOMMENDATIONS <br /> <br />All of the appraisal designs in the report are based on <br />limited data, since the verification activities are still <br />underway and the water and salt budgets crucial to under- <br />standing and quantifying salt loading are not complete. It <br />is recommended that the verification activities using a <br />full year of data be completed before writing the final <br />draft of the Appraisal Level Design Report. It is also <br />recommended that the data collection continue uninterrupted <br />for another year on those alternatives that stay in for <br />further consideration. The cost would be minimal since <br />most of the needed instrumentation is already in place. <br />This past year was not a typical year and another year of <br />data collection would .. smooth out" the data base and pro- <br />vide an opportunity to close gaps that were not discovered <br />until too late in the year. <br /> <br />I I <br />I <br />I <br /> <br />, <br />II: <br />'I! <br />'! I <br /> <br />II <br />I , <br /> <br />I <br />,I <br />" <br /> <br />\1 <br />I <br /> <br />BOT146-p <br /> <br />.-\ ,~ i ,. ,....,~ ,_A- <br />~! .J l . :l '.1 <br /> <br />11-7 <br />