Laserfiche WebLink
<br />000757 <br /> <br />. If a power emergency occurred during the Trash Rack Cleaning Project, other facilities of the <br />CRSP (i.e. Flaming Gorge, Glen Canyon) would provide first response to the emergency. If <br />needed, Morrow Point releases would be made to address the power emergency as long as <br />releases kept the reservoir within the draw down criteria (I to 3 feet/day). <br /> <br />. Rows in the Gunnison River below Crystal Reservoir wiIl remain within the general operations <br />of the AspinaIl Unit and would not be modified by the proposed trash rack cleaning project <br />action, Releases from Crystal would be based using existing operational criteria for the Aspinall <br />Unit. <br /> <br />21 <br />