Laserfiche WebLink
<br /> <br />TABLE OF CONTENTS <br /> <br />IJNi!'; <br /> <br />I, PURPOSE OF AND NEED FOR THE PHOPOSED ACT ION <br />PURPOSE <br />NEED <br />EXISTING SYSTEM <br /> <br />1 <br /> <br />c <br /> <br />Demand <br /> <br />Present Sources of Water <br /> <br /> <br />Existing Raw Water Supply System <br /> <br />Operations <br /> <br /> <br />Deficiencies of Existing System <br /> <br />FUTURE DEMAND <br /> <br /> <br />11. ALTERNATIVES <br /> <br />GENERAL <br /> <br /> <br />SCOPING PROCESS <br /> <br />ALTERNATIVES CONSIDERED <br /> <br />2 <br /> <br />Construction of Two Forks Reservoir <br /> <br />3 <br />5 <br />7 <br />7 <br />8 <br />10 <br />10 <br />10 <br />11 <br />11 <br />16 <br />19 <br /> <br />Construction of Wildcat Reservoir <br /> <br />Raising Elevenmile Canyon Dam <br /> <br /> <br />Reconstruction of Antero Dam <br /> <br /> <br />No Action <br /> <br />23 <br /> <br />27 <br /> <br />Purchase of Direct Flow Water Rights <br /> <br />Construction of Reservoir in the Denver <br />Metropolitan Area <br /> <br />Construction of Spinney Mountain Reservoir <br /> <br />3< <br /> <br />32 <br /> <br />32 <br /> <br />ALTERNATIVES WITHIN THE CAPABILITY OF THE <br />APPLICANT AND WITHIN THE JURISDICTION OF THE <br />CORPS OF ENGINEERS <br /> <br />41 <br /> <br />Mi tigation <br /> <br />ALTERNATIVES WITHIN THE CAPABILITY OF THE <br />APPLICANT BUT OUTSIDE THE JURISDICTION OF THE <br />CORPS OF ENGINEERS <br /> <br />4~ <br /> <br />46 <br /> <br />viii <br />