<br />, ,
<br />
<br />003188
<br />
<br />13. INELIGIBLE SEGMENTS, Conservationists i~ particular have, questioned
<br />the conclusions of the Study Team regarding the main stem of the
<br />Dolores from its source downstream to Rico, and from the confluence
<br />with the San Miguel River to Gateway, Why were these segments
<br />ruled out?
<br />
<br />
<br />Upper Main Stem: This IS-mile segment was judged ineligible for
<br />inclusion in the National System because it lacked any "outstandingly
<br />remarkable" qualities as specified in the Wild and, Scenic Rivers
<br />Act, It is,accurately, a typical high mountain stream - no more,
<br />no less. Nine miles of this stretch are paralleled by a paved
<br />state highway.
<br />
<br />
<br />Main Stem from San Miguel Confluence to Gateway: This 3D-mile
<br />segment was judged ineligible for several reasons, First and
<br />foremost, it is a heavily developed stretch of the river; a paved
<br />state highway follows it for 26 miles; mining activity, both past
<br />and present, is frequently visible; farming and ranching along
<br />the river are widespread; In addition, the segment lacks outstanding
<br />features, except perhaps geologic, Recreational attributes and
<br />use are low, and scenic resources moderate at best. The Study Team
<br />did recognize exceptional values in the 4-mile stretch immediately
<br />below the confluence where the canyon is deep and dramatic and
<br />the old Hanging Flume is of unique historic interest; however,
<br />this portion is simply too short for inclusion in the national
<br />system by itself.
<br />
<br />'t.~:;...
<br />~,iS.;
<br />~~.~
<br />
<br />.
<br />p
<br />
<br />~:;.k.....y
<br />r"","<I~ ..........
<br />Q"~'
<br />~~.. .~
<br />
<br />14. MANAGEMENT PLAN A number of individuals wondered how the Management
<br />Plan for those segments of the Dolores included in the National
<br />System will be developed, And when?
<br />
<br />~
<br />.'-
<br />
<br />The Study Team is empowered to develop a conceptual plan only for
<br />those segments it recommends for inclusion in the national system.
<br />By "conceptual," we mean it will be like a preliminary blueprint -
<br />a jumping-off point for the preparation of a final, working manage-
<br />ment plan,
<br />
<br />", ..
<br />
<br />,,\,....
<br />
<br />!.- _..~.'.
<br />- "'
<br />
<br />The latter plan will be developed only if Congress approves one
<br />or more segments of the Dolores for inclusion in the national
<br />system. In that case, the Forest Service, the Bureau of Land
<br />Management and the State of Colorado will have a year to prepare
<br />a detailed, concrete plan, This will allow adequate lime for
<br />specific input from concerned and affected persons,
<br />
<br />'. ~'. ,
<br />
<br />;~~~::.-
<br />.It.....
<br />
<br />
<br />15. ADDITIONAL INPUT, Almost everyone who wrote the Study Team wanted
<br />(implicitly or outright) to know when and how they'd ,have a chance
<br />to add more comment on the Dolores, the present study, and future
<br />actions.
<br />
<br />'~~,
<br />
<br />9
<br />
<br />'):-.~.;:',:~t:t.'.~,:.:,:,'.;.-;'\;J.~~,.',,:,~,,~,':,~,~,:'1"'.~,~~.:".',:~~-~:(~,..~-.','~:,'~-,"",",,~,',~."~,rl,-,;_i\,,::..."~-_'-,_----;- ,~. ...... i.. "--:--=-~----=---:-'-." ...... -1,-"" 'T" 1'". If' ,..,.} ,....:-,.'T.Io.'.. .1.~..
<br />. ~ ,'"' . "~ . 00' '.,-' ~ _ ~ -- .{,:-:::, ;':;:~\:~ ;:-:~/:~~::::~~.;;t;:::~:;';<:(0,::~.~::~::::;; .\::~;~:;,:<>~'\:~~;;'~\~;ti:~;J'~ti.~-;
<br />
|