Laserfiche WebLink
<br />Danas Proiect report ;~ady in 3 months <br /> <br />~- " .. <br /> <br />..'''--- <br /> <br />_',J___ <br /> <br />GLENWOOD SPRINGS - Revision acre.feetto a total of 25,000 acre.feet <br />of the definite plan report for the pro.. Concerning other activities of the bu- <br />posed Dallas Creek Project in Ouray reau, Rlnckel reported: <br />and Montrose counties will be com. Savery-Pot Hook in Colorado and <br />pleted within about three months. Wyoming: Problems concerning fish <br />J.F. Rinckel, chief of the planning di- and wildlife mitigation in both Colorado <br />vision of the Western Colorado Projects and Wyoming are still a concern, but ef. . <br />office of the Bureau of Reclamation forts are being made to resolve the <br />'made this report to the board of the Col- problems. . <br />orado River Water Conservation Dis- West Divide near Rifle . and Grand <br />trict at a meeting here Tuesday. . Valley: A number. of alternatives are <br />RInckel said the revision of the draft being prepared for consideration by an <br />environmental statement on the project. advisory committee. DrlllIng and mate. <br />is essentially complete. rlaJs explorati~n for the proposed Rag. . <br />Last spring, Gov. Richard Lamm ob. ged,Mounlain SIte on East Muddy Creek <br />jected to allocation of 24,000 acre-feet of.~a~ staI:led. .' .'. . <br />water to be developed b.y the project for.. . Yellow Jacke.1 near Meeker: A ~ulti . <br />acoal-burnIng electric generation sla. o~)!clive planmng team .for the project <br />tion planned by Kemmerrer Coal Co.,' w~,]meeINov.18toconsldervarlOusal. <br />and the bureau revised the projecl plan teil1ate plans of development. <br />. to use up to 15,400 acre.feet of that wa- . Dominguez Reservoir near Whitewa. <br />ter on lands under the existing Uncom. te': Draft of a cultural survey ~ archae- <br />pahgre Project The recreation pool of obgical, historical, and paleontological <br />Ridgway Reservoir on the Uncom- ~has been completed and is under re- <br />pahgre River will be Increased 10,000 v~w. The possibility of JX\wer from the <br /> <br />".'0 _', ',' >_-~ <br /> <br />"_. - '.' '.' ,.,~ <br /> <br />project being used as peaking (gener. <br />ated atUme of peak demand) by. the Col- <br />orado River Storage Project of the bu- <br />reau is under discussion. <br /> <br />Irrigation Management services - <br />Analysis of date collected is providing <br />Information on 6,000 acres to farmers <br />this year will be completed soon to be in. <br />cluded in. an anntml report. <br /> <br />. A public relations program to ac. <br />quaint farmers with the program Is <br />planned. <br /> <br />Lower Gunnison irrigation manage- <br />ment service was provided for 2,000 acr. <br />es under the Uncompahgre Project. <br />Grand Valley Systems Improve. <br />ment: Completion of aerial topography <br />will be completed this week. The field <br />inventory of lateral structure require- <br />ments, areas served by the laterals, <br />and related Information is now com. <br />plete. The data is being applied to maps <br />made by aerial photographic processes <br />to prepare cost estimates for improve- <br />ments to canal systems in the valley. <br /> <br />THE DAILY SENTINEL <br /> <br />\F"r",' aJ1<<7<.aneh <br /> <br />. WILLIAM H. NELSON, Editor <br />Page 6 - Salurdaf. October 25, 1975 <br />