Laserfiche WebLink
<br />OC2261 <br />. <br /> <br />TABLE 6 <br /> <br />SUMMARY OF FIRST COST <br />(August 1974 Prices) <br /> <br />FEDERAL COST <br /> <br />Relocations <br />Levees <br />Engineering and Design <br />Supervision and Administration <br />'Study Cost <br /> <br />TOTAL FEDERAL COST <br /> <br />NON-FEDERAL COST <br /> <br />Lands and Damages <br />Relocations <br />Engineering and Design <br />Supervision and Administration <br /> <br />TOTAL NON-FEDERAL COST <br /> <br />TOTAL PROJECT COST <br /> <br />SUMMARY OF ANNUAL COSTS <br /> <br />Interest a~d Amortization (.06234 x $968,000) <br /> <br />Operation & Maintenance <br /> <br />TOTAL PROJECT ANNUAL COSTS <br /> <br />. <br /> <br />34 <br /> <br />$ 93,000 <br />630,000 <br />20,500 <br />60,000 <br />92,500 <br /> <br />$896,000 <br /> <br /> <br />$ 51,000 <br /> 15,000 <br /> 3,000 <br /> 3,000 <br />$ 72 .000 <br />$968,000 <br /> <br />$ 60,400 <br /> <br />3,500 <br /> <br />$ 63,900 <br />