My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06674
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:51 PM
Creation date
10/12/2006 1:47:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8170
Description
Arkansas Basin Water Quality Issues
State
CO
Basin
Arkansas
Date
12/1/1975
Author
URS-Ken White Compan
Title
Arkansas River Basin Water Quality Management Plan - Appendix Part 1 of 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />1531 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />2. Service area <br /> <br />a. Legal description or map: The service area coincides <br />with the corporate limits. Poncha Springs will be <br />added in the near future. <br /> <br />b. % developed: 95% <br />c. % sewered: 99% <br /> <br />d. Current population served: 6,000, approx. 1,900 taps <br /> <br />3. Condition or age of collection system: In 1957, the <br />average installation date of the sewers was 1930. <br /> <br />4. Infiltration potential: The flow does increase during <br />mid April, May, June, July and August and is attributed <br />to infiltration. <br /> <br />III. EXISTING FACILITIES <br /> <br />A. Major Treatment Elements: trickling filter, screen, <br />comminutor, grit collector, primary clarifier; final clari- <br />fier, anaerobic digestion and chlorination <br /> <br />B. Location <br /> <br />1. Address: 1 mile southeast of Sa1ida <br /> <br />2. Map co-ords: NE \ of Sec. 9, T49N, R9E, New Mexico PM <br /> <br />C. Construction History: The plant was constructed in 1958-59. <br /> <br />D. "Hardware": <br /> <br />2 each - pretreated sewage pumps <br />variable speed <br />6" ~ Worthington <br />20 hp @ 860 rpm, 1180 gpm @ 38' TDH <br />16000 hours use per pump <br /> <br />1 - secondary sludge return pump <br />4" ~, 300 gpm @ 10', 1.5 hp, 750/900 rpm <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.