My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06674
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:51 PM
Creation date
10/12/2006 1:47:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8170
Description
Arkansas Basin Water Quality Issues
State
CO
Basin
Arkansas
Date
12/1/1975
Author
URS-Ken White Compan
Title
Arkansas River Basin Water Quality Management Plan - Appendix Part 1 of 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />III. EXISTING FACILITIES <br /> <br />A. Major Treatment Elements: 1 facultative aerated lagoon <br />and 4 facultative non-aerated lagoons <br /> <br />. <br /> <br />B. Location <br /> <br />1. Address: 1.5 miles southeast of Buena Vista <br /> <br />.1 <br />I <br /> <br />2. Map co-ords: NE \, Sec. 21, T14S, R78W, 6th PM <br /> <br />C. Construction History: The first four lagoons were constructed . <br />in 1960 with #5 being completed in 1968. Plans are to re- <br />move the dikes between lagoons 2, 3, 4 and 5 and make a single <br />lagoon (winter 1974-75). <br /> <br />D. "Hardware": <br />1 <br />(2) 5 hp Aqua-Aerobic floating aerators <br />I <br />I <br />E. Environment & Natural Hazards: Lagoon #1 is lined with 12 <br />incheslof clay, but lagoon #2 is not lined. <br /> <br />. <br /> <br />. <br /> <br />IV. PLANT OPERATION <br /> <br />A. Process Variables: The ponds are dosed with approximately . <br />2 tons per year of ammonium nitrate when the lagoons have <br />a grey appearance. <br /> <br />B. Plant Operation <br /> <br /> <br />1. Outfall inspection: no discharge since 1967 <br /> <br /> <br />2. Personnel and personal aspects: one part-time operator <br /> <br />. <br /> <br />V. SYSTEM ADMINISTRATION <br /> <br />.' <br /> <br />A. Financial Condition: All monies come from or are directed <br />through the State of Colorado. <br /> <br />B. Current Planning: Plans have been made to remove the dikes . <br />between lagoons 2, 3, 4 and 5 and make them into one large <br />lagoon. This will be done during the winter 1974-75 when <br />the ground water table is lower. <br /> <br />?R <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.