Laserfiche WebLink
<br />,~ <br /> <br />~;~~~~ <br />.~. <br /> <br />rn <br />.. ' <br /> <br />I:-..~ <br /> <br />, <br /> <br />'. <br /> <br />OplUlOIl is finalized. A final plan will be completed within 6 months of . <br />the coulpletion date for the draft and will be revised, as needed, after <br />conclusion of the conservation measure humpback chub studies. <br /> <br />Each agency will be responsible for their participation, in the plan. <br />Reclalllation will fund tbe plan's preparation and distribution and maintain <br />the lead in plan implementation. All materials for the cooperative agency <br />pIau alld the contingency plan will be provided by the Reclamation. <br /> <br />2 <br />