My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06627
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:39 PM
Creation date
10/12/2006 1:46:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1974
Title
Report of the Rio Grande Compact Commission 1974
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />':'4 <br />0' <br />C''';l <br /> <br />26 <br /> <br />RIO GRANDE COMPACT COMMISSION REPORT <br /> <br />RECORDS OF DELIVERIES AND RELEASES <br /> <br />'-- <br /> <br />At the annual meeting of the Compact Commission on March 27, 1975, the <br />records of deliveries and releases for calendar year 1974 were examined and <br />the computations of debits and credits based thereon were reviewed. The <br />records and computations as reviewed by the Commission are reproduced on the <br />next three pages~ <br /> <br />The delivery of water in the Rio Grande at the Colorado'-New Mexico State <br />line was obtained from record of streamflow near Lobatos, Colorado; the <br />obligation of Colorado to deliver water at the State line was computed as <br />prescribed in Article III. Item CS, the Reduction of Debits prescribed in <br />Article VI, was computed in accordance with the Rules and Regulations. <br /> <br />The delivery of water by New Mexico to Project Storage was computed from <br />the actual streamflow record and the record of operation of Elephant Butte <br />Reservoir; the scheduled delivery was computed as pres'cribed in the Resolution <br />of the Commission adopted at the Tenth Annual Meeting, and published in this <br />report. Item NM4, Reduction of Debits by Evaporation, was computed in <br />accordance with the Rules and Regulations. <br /> <br />The actual release from Project Storage during the year was measured <br />at stations below Caballo Dam. The Accrued Departure from Normal Release <br />is an under-release but is omit,ted in accordance with a decision of the <br />Commission at the meeting on February 15, 1968. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.