<br />Gunnison-Arkansas Projeot
<br />
<br />April 14, 1949
<br />
<br /> Construotion Cost Allocation
<br /> Alternate Specifio Remaining. Peroent of
<br />Purpose justifiable Joint oost Allo5ation
<br /> ezpenditure oost alternative joint cost
<br />Irrigation 1 74.113,000 1 0 1 74.113.000 60.07 153,674,347 1 53,674,000
<br />Mln1ci pal water 13,029.000 0 13. 029.000 10.56 9.435,617 9,436,000
<br />Hydroelectrio power 44.142,000 37,566.000 6,556,000 5.31 4,744.64'" "2.331,000
<br />Flood control 25.890.000 0 25.890,000 20.98 18.746.259 18.746.000
<br />Sediment control 3,797,000 0 3,797,000 3.06 2,752,073 2.762.000
<br />Recreation 157,000 157.ooo 0 0 0 157 ,000
<br />Total '161,128,000 1 37,743,000 1123,385,000 100GOO $89,353.000 $127,096.000_
<br />
<br />~;:-
<br />
<br />(..
<br />.. '
<br />c."
<br />[~
<br />G:)
<br />
<br /> Apportiol1lll8nt of Operation.
<br /> Ylintenance and Re laoeDlllnt Costs
<br /> 1 34,170 . 34,170
<br />Vunioi pa 1 0 12.22 6,010 6.010
<br />hydroelectrio power 979,lllO 6.14 3,020 982,200
<br />Flood control 0 6.26 3,080 3,080
<br />Sediment oontrol 0 5,93 2.920 2,920
<br />Recreation 30.000 0 0 30.000
<br />Total 1 1,009,180 100.00 1 49,200 . 1.058 380
<br /> ,-
<br />
<br />
<br />
|