Laserfiche WebLink
<br />Gunnison-Arkansas Projeot <br /> <br />April 14, 1949 <br /> <br /> Construotion Cost Allocation <br /> Alternate Specifio Remaining. Peroent of <br />Purpose justifiable Joint oost Allo5ation <br /> ezpenditure oost alternative joint cost <br />Irrigation 1 74.113,000 1 0 1 74.113.000 60.07 153,674,347 1 53,674,000 <br />Mln1ci pal water 13,029.000 0 13. 029.000 10.56 9.435,617 9,436,000 <br />Hydroelectrio power 44.142,000 37,566.000 6,556,000 5.31 4,744.64'" "2.331,000 <br />Flood control 25.890.000 0 25.890,000 20.98 18.746.259 18.746.000 <br />Sediment control 3,797,000 0 3,797,000 3.06 2,752,073 2.762.000 <br />Recreation 157,000 157.ooo 0 0 0 157 ,000 <br />Total '161,128,000 1 37,743,000 1123,385,000 100GOO $89,353.000 $127,096.000_ <br /> <br />~;:- <br /> <br />(.. <br />.. ' <br />c." <br />[~ <br />G:) <br /> <br /> Apportiol1lll8nt of Operation. <br /> Ylintenance and Re laoeDlllnt Costs <br /> 1 34,170 . 34,170 <br />Vunioi pa 1 0 12.22 6,010 6.010 <br />hydroelectrio power 979,lllO 6.14 3,020 982,200 <br />Flood control 0 6.26 3,080 3,080 <br />Sediment oontrol 0 5,93 2.920 2,920 <br />Recreation 30.000 0 0 30.000 <br />Total 1 1,009,180 100.00 1 49,200 . 1.058 380 <br /> ,- <br /> <br /> <br />