My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06613
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:34 PM
Creation date
10/12/2006 1:45:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
11/16/1982
Author
USDOE/WAPA
Title
Hearing on Information Forum, CRSP, Proposed Adjustments of Transmission and Power Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />thf' propos;ll to Adjust CI1,;P power find tri'nsmi ssion rfltf!s. The <br /> <br />2 public information forum is being held todflY and the public <br /> <br />J (,OI':JlI(,nt forum is scheduled for Occember Jr., J9B2. The public <br /> <br />~ consultation 2nd comment period lflsts for 90 dflYs. Comments <br /> <br />') ,Ii I I he ;1CCf!pt.f:rJ lit thE' comment forum or in writing any time <br /> <br />r; (lurin'J this period which ends aanuary llith, 1983. <br /> <br />7 {,ft.er t.he close of this periorl j,;ester< will review all the <br /> <br />8 commcents and mflY revise the proposed rates as a consequence of <br /> <br />9 tIle inforlll~lion receiverl. <br /> <br />If the rntes ~re revis~~ Western's <br /> <br />10 ndminlstri'tor mflY decide to flllow 30 days for additional <br /> <br />11 <br /> <br />comrnpnt.s. <br /> <br />If this is np.cl'ssflry the lilst 2 nates shown here <br /> <br />12 'lOuld prob,lbly be delflYf!('. Should he decide thilt an additional <br /> <br />13 comment period is not nf!eden, the Assistant Secrf!tary to <br /> <br />l~ Conservation find Renewable Energy is expected to announce rflte <br /> <br />15 2djustrnent.s on fin interim bflsis prior to Milrch 1st, 19P3. <br /> <br />16 <br /> <br />We plan to have these interirn rates in effect by the <br /> <br />17 be<Jinning of the April, 191'3 billing ppriod. <br /> <br />I have flske(l <br /> <br />18 Marlene Moody the Assistflnt Area ManAger for Power Marketing to <br /> <br />]C) review tho necn for the rDt.f' adjustments, the criteria which <br /> <br />20 were followed, find some of the ~ssumptions that were made in <br /> <br />21 developing these proros~ls. <br /> <br />22 <br /> <br />,,",":;. ~10(\DY: <br /> <br />1'h~nk YOIl, AI. Good mornin<J. <br /> <br />23 <br /> <br />~!cst{~rn, cnctl Yl'~r, ~I~k(~s 2 power r{~pnymQnt study to <br /> <br />2~ determine if the rate ~nd rf!pAyment requirements are being met. <br /> <br />25 The composite power rAte is now 7.P~ mills per kilowiltt hour <br /> <br />9 <br /> <br />Intermountain Court Reporters <br />2G]-] 3% <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.