Laserfiche WebLink
<br /> <br />r---- <br />;> <br />3 <br />4 <br />5 <br />Ii <br />7 <br /> <br /> 11 <br /> 12 <br />r-- 13 <br />'-- <br /> ] 4 <br /> 15 <br /> I" <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> <br />. <br /> <br />. <br /> <br />1 repi1ymcnt." <br /> <br />I-:e interpret the phrase" allocated at th"t time" to <br /> <br />incluele not only those r:osts spent to date, but to include all <br /> <br />future r:osts allocated to authorized projects. Historically, <br /> <br />the Bureau has provided the secretary this information in the <br /> <br />Cl1l;P annui'll report. <br /> <br />The scheduling of the construction of: the participating <br /> <br />8 projects in the proposed adjustment of transmission and power <br /> <br /><) r"tes was based upon the following criteria: <br /> <br />10 <br /> <br />Of the participating projects which have be authorized by <br /> <br />Public Law e4-~R5, and subsequent legislation, only one, Pine <br /> <br />River Extention, has been deauthorized. The remaining federal <br /> <br />projects fit into one of the following four classifications: <br /> <br />One, Completed projects. <br /> <br />Two. Projects understand construction. <br /> <br />Three. Projects awaiting construction funding. <br /> <br />Four. Projects currently in an inactive status, <br /> <br />There is not much unr:ertainty concerning the projects <br /> <br />which everybody completed or are under r:onstruction. The costs <br /> <br />and timing of construction and repayment are generally known. <br /> <br />2] On projects Awaiting construction with the date not yet certain, <br /> <br />22 WE, exercise our best judgmE'nt each year concerning the timing <br /> <br />23 of construction, i1nd repi'lyment requirements. The dates shown <br /> <br />24 in each annual report are estimated dates based on conditions <br /> <br />25 existing at the time. These elates may change from one year to <br /> <br />29 <br /> <br />Intermounti1in Court Reporters <br />1.()3-139li <br />