My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06613
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06613
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:34 PM
Creation date
10/12/2006 1:45:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Rates
Basin
Colorado Mainstem
Date
11/16/1982
Author
USDOE/WAPA
Title
Hearing on Information Forum, CRSP, Proposed Adjustments of Transmission and Power Rates
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />1--....-. <br /> <br />,.- <br /> <br />I <br /> <br />. <br /> <br />I <br /> <br />. <br /> <br />. <br />. <br />. <br />II <br /> <br />. <br /> <br />. <br /> <br />1 ~()n Ml,':'s of tl1errnnl ')c.nerat.ion ilt tl1e crilig-Hi'ly(l~~ complex unel <br /> <br />? the four Corners Complex for CRSP hyrlro-generation at Glen <br /> <br />1 (;lInyon. Tl1ro11')1-< tl10se exchrn')es, the CRSP is lIble t.o serve <br /> <br />tl it. I tl customers \Ji th lCR~) transmi ssion investment and less <br /> <br />,. <br />., <br /> <br />lo~,Hes. <br /> <br />r; <br /> <br />Tn a like mnnner, the ~a]t River nnrl Colorado Ute nre able <br /> <br />7 to redllce their costs, 'l'he rRSP receives a 75 percent kilowatt <br /> <br />l' yeiH for U1C power thnt is exchi'nged, The light ilrrows <br /> <br />9 represent how some of the CRSp power would be scheduled without <br /> <br />]() the ~alt River project exchan')e n')reements, and the rlatk arrows <br /> <br />]1 represent the tran~misBion path that would be needed by Salt <br /> <br />l? Rivt'r project without an exchange. With t.he exchange agreement, <br /> <br />13 however, some of the CRSp loads are served by the Salt River <br /> <br />l~ project's thermal generation, while some Salt River project <br /> <br />]5 IOilds are supplied with hydro-generation from Glen Canyon. By" <br /> <br />"," 1\ <br />\',,].r; ..,xc]ue1!ng both the ci:lp<,city commitments and the revenue <br />\ \ y' <br />'; \ \ ~ :\ <br />\'," ,17 received llnderstllnd these exchan')e a')reements from the <br />I <br /> <br />HI (?]clllntion of tl1e firm transnlission rate, firm power customers <br /> <br />19 as well as those who pllfchilse trnnsmission service, benefit. <br /> <br />?n The propose~ firm transmission rate is based on <br /> <br />'1 projections of the anticipnt.ed transmission syst.em investment <br /> <br />7? in fiscal yenrs ]91'?, B1 And n~. The annual costs were <br /> <br />?3 estimnted by assumin9 the Amort.ization of these investment <br /> <br />2~ tr~nsmission f~cilitles in 50 yenrs ~t 2.R75 percent interest, <br /> <br />25 and D~rling to th~t the Q And M costs and replacement costs. <br /> <br />~5 <br /> <br />Tntcrmollnt~in Court Reporters <br />"') (; .~ - 1 1 f\ (. <br />
The URL can be used to link to this page
Your browser does not support the video tag.