Laserfiche WebLink
<br />" <br />, <br /> <br />CO <br />;.fj <br />, , <br />\,"., <br /> <br />...-I <br /> <br />, ;'.1 <br /> <br />,.". <br />'.-..1 <br /> <br />.'t <br /> <br />October 1982 estimates <br /> <br />Table 3 - Reduced Development Plan <br />PUBLIC USE FACILITY DEVELOPMENT COSTS <br /> <br />AT <br /> <br />SAN LUIS LAKE <br /> <br />'::~. Picnic Site (15 each) <br />. <br />. '- <br />. J :,. <br />Includes: shelter, fire grate, and table <br />15 each @ $3,600 <br /> <br />$ 54,000 <br /> <br />Campsites (0 each) <br /> <br />Includes: table, trash container, parking space, <br />camping pad, .and shelter - None <br /> <br />-0- <br /> <br />Boat Ramps. (2 each -.24' X 200') <br /> <br />Includes: \6-inch concrete over 4-inch gravel, boat dock, <br />240' X 80' parking lot with 6-inch gravel <br />surfacing <br />2 each @ $42,000 <br /> <br />84,000 <br /> <br />FishinR Access Areas (6 each.~.gravel) <br /> <br />6 each @ $2,000 <br /> <br />12,000 <br /> <br />Sanitary Facilities (2.each) <br />2 each @ $5,000 <br /> <br />10,000 <br /> <br />Trails (0 miles) <br /> <br />o miles <br /> <br />-0- <br /> <br />Water: System - None <br />'.. Roads, . LandscapinR, . and . Fencing <br /> <br />.," -O~' :" <br />~... ....'. <br /> <br />...-' <br /> <br />$254,000. <br /> <br />,. Unlisted Items - None <br /> <br />" <br /> <br />-0- <br /> <br />Contingencies (20 percent +) <br />Field Costs <br />Overhead (35 percent) <br />Total Construction Cost: <br /> <br />$414,000 <br />82,000 <br />$496,000 <br />174,000 <br />$670,000 ' <br />