My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06602
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:30 PM
Creation date
10/12/2006 1:45:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
9/30/1982
Title
Agenda Item 12a - October 7 1982 - Board Meeting -- Closed Basin Project Enhancement Plan
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'.. <br /> <br />" <br />. co <br />~1) <br />\- ) <br />~~ <br />':) <br /> <br />October 1982 Estimates <br /> <br />l-.;) <br /> <br />Table 1 - Full Development Plan <br />PUBLIC USE FACILITY DEVELOPMENT COSTS <br /> <br />AT <br />SAN LUIS LAKE <br /> <br />Picnic Sites (40 each) <br /> <br />Includes: shelter, fire grate, and table <br />40 each @ $3,600 <br /> <br />$ 144,000 <br /> <br />Campsites (60 each) <br /> <br />Includes: Table, trash container, parking space, <br />calJ\ping pad, and shelter <br />60 each @ $3,700 <br /> <br />222,000 <br /> <br />Boat Ramps (2 each ~ 24' 'X-200') <br /> <br />Includes: 6-inch.concrete over 4-inch gravel, boat dock, <br />240' X 80' parking lot with 6-inch gravel <br />2 each @ $42,000 <br /> <br />84,000 <br /> <br />Fishin~ Access Areas (6 each-~grave1) <br /> <br />6 each @ $2,000 <br /> <br />12,000 <br /> <br />Sanitary Facilities (2 each) <br /> <br />Includes: Comfort stations with flush toilets <br />and leaching field <br />2 each @ $61,000 <br /> <br />122,000 <br /> <br />Trails (2 miles) <br />2 miles @ $8,500 <br /> <br />17,000 <br />85,000 <br />, 289,000 <br /> <br />, . <br />" <br /> <br />lvater System <br />Roads, Landscapin~, and Fencing <br /> <br />: ..... <br /> <br />Unlisted Items <br /> <br />Contingencies (20+) <br />Field Cost <br />Overhead (35 percent) <br />Total Construction Cost: <br /> <br />97,000 <br />$1,073,000 <br />215,000 <br />$1,288,000 <br />451,000 <br />$1,739,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.