|
<br />SCHEDULE
<br />
<br />IP t
<br />3P
<br />4P
<br />5P I
<br />6P
<br />7P
<br />8P
<br />9P 1
<br />lOP ,
<br />liP I
<br />
<br />29P
<br />31P
<br />3~P}
<br />35P
<br />36P
<br />41P
<br />
<br />f':'
<br />c"';
<br />.."'"
<br />
<br />TABLE 13
<br />UISTRI8UTlON SYSTEM PRECAST CONCRETE PIPE L11'1'5
<br />Conslruclioh Cosl 10 June 30, 194-2
<br />
<br />COj'HRACTOR
<br />Lorge diameter
<br />AJ1lt'riean Conerele & Steel Pipe Cu.
<br />
<br />American Concrele & SleeJ Pipe Co...
<br />
<br />J. F. Shea Co., InCh.
<br />United Concrete Pipe Corporation..,
<br />
<br />Ullil~r-l COllcrele Pip.. C"rpMati.)n
<br />
<br />Total (3.5.66 miles:l
<br />
<br />Small diameter
<br />
<br />American Concrete & Steel Pipe Co...
<br />Uniletl Concrete Pipe Corporation...
<br />
<br />Amerit'an Concrete S: Steel Pipe Co.....__
<br />
<br />American Concrete &: Steel Pipe Co.
<br />
<br />Total (28.12 miles)
<br />Grand tolal--63.78 miles.
<br />
<br />CONTRACT WORK
<br />AWARDED COMPLETI::D
<br />Jan. 10, 1936 Dec. 23, 1937
<br />NO\'. 1, 1935 J line 18, 1937
<br />Dec. 20. 1935 May 24, 1938
<br />NO\.. I. 1935 Mar. 17, 1937
<br /> {oct. 31. 1938
<br />Aug. 7, 1936 Aug. 13. 1937
<br /> N",. 27, 1937
<br />
<br />1\1ay 17, 1940
<br />June 28, 1940
<br />July 10. 1940
<br />Sl"pt. 6, 1940
<br />
<br />Jan. 15, 19.J.l
<br />Jllly 2, 1941
<br />July 28, 1941
<br />Jllne 5. 1941
<br />
<br />- ~
<br />,.~
<br />
<br />INSIDE
<br />DlAM. LE~CTlI TOT.-'r.L COST
<br />INCHES. It' fEET COST PIo:R FOOT
<br />jI'lO 12,277 $ 652..542.0.') $ 53.15
<br />140 20,I2~ I,21HI1.66 60.50
<br />1152 25,867 1.292,746.11 49.98
<br />152 24,892 1.146.06~.03 46.04
<br />{ !olD 27,294 1,506,614.56 55.20
<br />!olD 29,950 1,711,839.22 57.16
<br />123 2~,529 1.484.952.38 60.54
<br />116 8,691 458.327.0 I 52.74
<br />116 10,517 531,]51.88 50.50
<br />116 4.127 30U68.18 73.05
<br /> ]88.268 $10.303,117.08 $ 54.73
<br />.iA ]2,8IS $ 339.176.24 $ 26.46
<br />~2 30,670' 643,664.98 20.99
<br />{'2.39 33.200' 427.023.03 12.86
<br />36 46,599 580,507.95 12.46
<br />36 :20,044 254.352.39 12.69
<br />30 5,164 96,417.68 18.67
<br /> 148.<195 $ 2,341.142.27 $ 15.77
<br />
<br />'[ncludts 780 fed of welded steel J,lipe in~tall..J in CahuengJ Fr~ewav by Radich and Brown.
<br />CConstrucliOIl suhconlraeted t,) l;l]il~d Concrete Pipe Corporat"l11. .
<br />
<br />~,
<br />
|