Laserfiche WebLink
<br />I <br />J,' <br />I~ <br />:j <br />:~ <br />~ <br />~. <br />,} <br /> <br />i <br />I, <br />I' <br />I, <br />I <br />I <br />I <br />r~ <br /> <br />" <br /> <br />I <br />I <br />, <br />I <br />i <br />, <br />I <br /> <br />I <br /> <br />f'! <br />I <br />, <br /> <br />, <br /> <br />r <br />II <br /> <br />2Cl0 <br /> <br />CII..\PTER I <br /> <br />FINANCING <br /> <br />DETAILED information covering the financing of the Colo- <br />rado Ri\'er aqueduct project is gi\'en in the first, second, <br />and third annual reports of The Metropolitan Water Dis- <br />trict of Southern California. The pre\'ious reports may be briefly <br />summarized as follows: <br />On September 2g, 1931, the voter~ of the District by a majority <br />of substantially five to one, authorized the issuance of bonds in <br />the amount of $220,000,000 for the purpose of financing the con- <br />struction of the aqueduct project. <br />The District has issued a total of $180,684,000 of the authorized <br />issue of bonds, all of which were sold to the Reconstruction <br />Finance Corporation except n,50Q,OOO of four per cent bonds <br />which were sold to the Public Works Administration. The entire <br />amount is now held by private investors. <br />The $179,184,000 of bonds sold to the Reconstruction Finance <br />Corporation were issued in installments as funds were required <br />by the District and bore interest at the rate of five per cent per <br />annum. However, from April 1, 1934 until the bonds were re- <br />funded, as related in the previous annual reports, the Reconstruc- <br />tion Finance Corporation adjusted the interest rate to a four per <br />cent basis. In the refunding operation, interest rates were reduced <br />to an average of 3.933 per cent per annum for the entire issue of <br />$180,684,000. The bonds consist of: <br /> <br />1\'\'E <br />Refunding <br />Refunning <br />Hefunding <br />Original. <br />nerulIJing <br /> <br />1:~n:IlI'sl' <br />Tl,o.1L <br /> <br />:\:o.HlUNT <br /> <br />.1 <br />3~~ <br />4 <br />,1 <br />41;.,. <br /> <br />$ ] 2.096,000 <br />16,992,000 <br />93.644,000 <br />1,500.000 <br />.\6.452.000 <br /> <br />$180.684.000 <br /> <br />In the early days of the project and up to December 1932, all <br />costs of organization, designs, and surveys were paid from the <br /> <br />:[ 7 ] <br />