Laserfiche WebLink
<br />\ <br />\ <br />\ <br /> <br />Fruitland Mesa <br />~tigation Comparison <br /> <br />Construction Cost <br />Increased Costs <br />Fish flows (10 cfs - 15 cfs or inflow) <br />Minimum pool (120 acres) <br />Multi-level outlet <br />Big Game Range Acquisition to development <br />13,000 acres <br />Big Game depredation <br /> <br />$79,250,000 <br /> <br />2,350,000 <br />650,000 <br />. 600,000 <br /> <br />6,675,000 <br />420,000 <br />$89,945,000 <br /> <br />,Proje~t Cost <br /> <br />Benefit Cost Ratio <br />Direct <br />. Total <br /> <br />With With <br />Bureau State <br />mitigation mitigation Difference <br />79,250,000 89,945,000 +10,695,000 <br />.75:1 .66 -.09 <br />1.18:1 1.05:1 -.13 <br />5 4 -1 <br />$4,364 $4,650.' +$286 <br /> -$.9,000 <br /> <br />Percent Paid by local people <br /> <br />Cost per acre <br /> <br />Annual tax loss from 13,000 acres <br />