Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />1\ <br /> <br />I <br />t <br /> <br />~ <br /> <br /> 39 <br /> TABLE 28 <br /> SUMMARY Of SIGHIFICAHT GEHERATION ADDITIONS <br /> CALIFORNIA - SOUTHERH HEVADA POWER AREA <br /> (WINTER CAPA8ILITY) <br /> Comnerc1al <br /> SI2e Operation <br />Name OrClanizat1on location HW Date COlTJJ1ents <br /> HYDRO <br />Kerckhoff 2 PG&E San Joaquin River, CA 151 10/83 <br />Balsam Meadow Hydro SCE CA 100 1/88 <br />Di nkey Creek SCE CA 120 3/88 <br /> HYDRO-PUMPEO STORAGE <br />Helms Pumped Storage 1 PG&E Kings RiVer, CA 374 5/83+ <br />Helms Pumped Storage 2 PG&E Kings River, CA 374 6/83+ <br />Helms Pumped Storage 3 PG&E Kingt River, CA 375 6/83+ <br /> STEAH-COAL <br />Reid Gardner 4 NEVP Moapa, NV 150 8/B3 NEVP 31.1%, CDWR 67.8%. <br />Intermountain 1 LDWP Hi llard Co., UT 75D 7/86 LDWP 34.1%, ANHH 10.2%, <br /> BURB 1.7%, GLEN 1.7%, <br /> PASA 3.4%, RVSD 6.8%, <br /> ICPA 17.1%, UPLC 25%. <br />Intermountain 2 LDWP Hillard Co.. UT 750 7/87 See Unit l. <br />Intermountain 3 LDWP Hillard Co., UT 750 7/88 See Un; t 1. <br />Allen 1 NEVP Las Vegas, NV 500 5/89 . <br />White Pine 1 LDWP White Pine Co., NV 750 6/89 LDWP 39.1%, ANHM 3.6%, <br /> BURB 1.95%, GLEN 1.85%, <br /> PASA 1.85%, RVSO 2.65%, <br /> BOULOER CITY 2.5%, <br /> LCPO 2.5%, NEVP 25%, <br /> SPP 10%, OVEROH PWR <br /> DIST 2.5%, VALLEY <br /> ELECTRIC ASSOC 2.5%, <br /> HT. WHEELER POWER INC. <br /> 3.0%, WELLS RURAL <br /> ELECTRIC CO 1%. <br />Intennounta1n 4 LDWP Hillard Co., UT 750 7/89 See Unit 1. <br />Allen 2 NEVP Las Vegas, NV 500 5/90 See Unit 1. <br />White Pine 2 LOWP White Pine Co., NV 750 6/90 See Unit 1. <br /> NUCLEAR <br />San Onofre 2 SCE San Clemente, CA !l00 4/83+ SCE 80S, SOGE 20%. <br />Diablo Canyon 1 PG&E San Luis Obispo, CA 1084 5/83+ <br />San Onofre 3 SCE San Clemente, CA !l00 9/83+ SCE 80%, SOGE 20%. <br />Diablo Canyon 2 PG&E San Luis Obispo, CA 1106 11/83+ <br /> <br />. Joint Project: NEVP 18.6%, Unsubscribed 81.4%. <br /> <br />+ Updated information as of June 1983 regarding projected unit in service dates 1s presented in the last <br />section of this report titled State Df the WSCC Interconnected Bulk Power System Through 1992. <br /> <br />(Continued--) <br />