My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06522
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:09 PM
Creation date
10/12/2006 1:41:38 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
5000.125
Description
Flood Protection Section - Pikes Peak Early Flood Warning System
State
CO
Basin
Arkansas
Water Division
2
Date
3/12/1986
Author
George K Cotton
Title
Overview of Flood Warning Systems
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OGJ487 <br /> <br />7 <br /> <br />are difficult to assess before hand but the following are typical costs of key <br />components: <br /> <br />Sensors <br /> <br />Precipitation <br />Stage <br /> <br />$ <br />$ <br /> <br />500- <br />500- <br /> <br />1,000 <br />1,000 <br /> <br />Data Collection Platform <br /> <br />$ 2,500- <br /> <br />5,000 <br /> <br />Computer <br /> <br />Large Network - Minicomputer <br />Moderate Network - Super-Microcomputer <br />Small Network - Microcomputer <br /> <br />$200,000- 300,000 <br />$ 25,000- 50,000 <br />$ 5,000- 10,000 <br /> <br />Communication Equipment <br /> <br />Repeater Stations <br />Base Station <br /> <br />$ 5,000- <br />$ 1,000- <br /> <br />15,000 <br />3,000 <br /> <br />Data Management Software <br /> <br />Minicomputer <br />Super-Microcomputer <br />Microcomputer <br /> <br />$ 20,000- <br />$ 5,000- <br />$ 1,000- <br /> <br />50,000 <br />10,000 <br />5,000 <br /> <br />The price ranges shown are largely a function of performance, As with <br />most products there are no-frills and high-performance versions, Each has a <br />place in the market, so it is important to be cognizant of the system's par- <br />ticular requirements. <br />An estimate of the implementation cost of forecasting models is not given <br />since the type of model that will be selected can not be known, The scope of <br />work for implementation of the forecasting models should include loading and <br />benchmark runs on the computer system, initial calibration to historic events, <br />and follow-on calibration with the complete data collection system in place. <br />There will also need to be budget for loading all baseline data into the data <br />management system that configures the forecasting models. <br />The range of maintenance and support task necessary to support the system <br />are numerous and should be considered realistically, These tasks range from <br />semi-nnual inspection of the field sites, to computer services contracts and <br />continued model calibration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.