Laserfiche WebLink
<br />----- - - <br /> <br />~ < . <br /> <br />Legal <br /> <br />Financial <br /> <br />-- -"~-~~"""'l.. <br /> <br />- Proposed 4.5 foot flash boards to increase flood control storage by,75"maf. <br /> <br />- operations within the Law of the River <br />- Compact delivery, minimum objective release is 8,23 maf <br />- Bypass Power Plant Capacity with Spring Spike (45,000 cfs)(Beach-Habitat <br />building flows <br />- Reduce peaking power generating capacity (maximum release 20,000 cfs in <br />8.23 maf release year) <br /> <br />Operation of Power Plant impacts revenues significantly <br />Reduces peaking power/value of power generated <br />Increase in Power Rate <br />Ability to meet Basin Fund Repayment Obligation <br />Reallocation of CRSP cost required by GC Project Act (some costs will be non- <br />reimbursable), <br />Cumulative impacts to power due to operational changes at Glen Canyon - <br />Aspinall - Flaming Gorge <br /> <br />These are major issues - <br />Staff is preparing comments <br />Discussion of Positions <br /> <br />W:BOARDMEM\MARCH94\05AMAR <br /> <br />'. <br />