My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06514
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06514
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:23:07 PM
Creation date
10/12/2006 1:41:28 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
6/17/1977
Author
Engineering consulta
Title
Proposal For Consulting Services for Narrows Dam
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1801 SOUTH NAVAJO STREET. DENVER, COLOfU.OO e.0223, U.S_A. <br />TELEPHONE: 303/838.34'7 . TELEX. 45-551 . CABLE: ECIDEN <br /> <br />E-.:. ll~ :NOINEERINO CONSULTANTS, INC. <br /> <br />June 17, 1977 <br /> <br />Mr. Felix Sparks, Director <br />Colorado Water Conservation Board <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />Our File: <br /> <br />7106/318 <br />DG 839/77 <br /> <br />Subj ect: <br /> <br />Proposal for Consult- <br />ing Services - Narrows <br />Dam <br /> <br />Dear Sir: <br /> <br />Eel is pleased to present herewith our proposal for furnishing <br />certain consulting services for the Narrows Dam. The proposal is based on <br />our meeting with you and Mr. Morrill on June 3, 1977, a site inspection <br />and meeting with Mr. R. W. Radcliffe in Fort Morgan on June 10, 1977, on <br />our review of geological and design data at the U.S.B.R. Engineering and <br />Research Center in Denver on June 14, 1977, on discussions with U.S.B.R. <br />staff in Denver and on the following basic scope of services: <br /> <br />1. Collect and review data that is to be furnished to the Inde- <br />pendent Panel of Experts. <br /> <br />2. Monitor meetings of the Independent Panel of Experts. <br /> <br />3. Review foundation geology. <br /> <br />4. Perform dam and foundation seepage analysis with special em- <br />phasis on the right abutment. <br /> <br />5. Evaluate adequacy of the embankment design. <br /> <br />6. Provide critique on report prepared by Independent Panel of <br />Experts. <br /> <br />7. Provide a final report on the dam embankment stability and <br />foundation seepage analysis, including recommendations for <br />additional testing, investigations and design considerations, <br />if necessary. <br /> <br />A. PLANNING RESEARCH CORPORATION COMPANY <br />
The URL can be used to link to this page
Your browser does not support the video tag.