Laserfiche WebLink
<br />0003J8 <br /> <br />. <br /> <br />Handu'l EDlineuinl, Manuhctudnl, Qlality Anuunu. and wll_n <br />Service CApabilitiel <br /> <br />, <br /> <br />Handar'l bu.ine.. i. in the manuhcturinl of equipment to collect <br />environmental diu. Consequently, this field equipment mull be tuned Ind <br />reliable.. Hanclar .tresles quality in all phuu of their organization in <br />order to be.t .erve Gur cu.taner'. need.. <br /> <br />Handar'. Bnaineuina Department ha. the nperience and ezpertise <br />needed in the field. of tualedized data acqui.ition .y.tem.. includina <br />analog and digital hardware. radio de. ian, and loftware. Innovative mecha- <br />nical duign. arc used to make componenu, .uch .. watn level .en'oEl Ind <br />tipping bucket., for ez~le. .imple and reliable under har.h environment.. <br />Electronic enaineer. ezperienced in microproce..or de.ian choo.e low power <br />con.umina CMOS componentl to eztend the operatina life of the.e battery <br />operated .y.tem. and component.. All Handar de.ian. arc te.ted to operlte <br />under eztreme temperature condition.. from -40 C to +60 C in mo.t all <br />Clles. <br /> <br />'.. <br /> <br />Hlndar'. Manuhcturina Department conccntratu in .everal arell to <br />en.ure tha~ the .fini.hed product meetl Handar'. quality Itandard.. Pir.t, <br />reliable c~entl and materials nndors arc' aclecud. Then pur chand <br />product. are te.ted to en.ure they arc within .pecification. before a..em- <br />blina equipment. Cry.tal olcillaton u.ed in radio tran.mitten, for <br />ezample, arc burned in for 16 hour. of eztenlive temperarure eyclin. to be <br />.ure they meet their .trinaent laina and drift charlcteriltic.. <br /> <br />All equipment, includina componentl. cable, and luba..embliel, il <br />carefully a..embled by well-trained employeel. PC boardl and .uba..emblie. <br />arc checked to en.ure partl arc loaded and wired correctly. A full opera- <br />tional electrical tut is made of the equipment in two environmental cham- <br />ber.-one ICt at -20 C and the other at +60 C. All equipment IIlUIt operate <br />within .pecification at the.e two temperature eztremel. In addition, all <br />product. include over 100 houri of bot and cold temperature te.tinl. A <br />final mechanical iaapection la performed to check that all connection. and <br />.eal. arc tiJbt. cable. tied. de..icant bal' added, frc.h batterie. in- <br />lulled, etc. <br /> <br />All iaapection recordl arc carefully procelled u.inl a computer data- <br />bile. Recordl Cln then be ea.ily lDalyud to compute euablhhed Mean Time <br />Between Pailure (MIBP) ratu. <br /> <br />Handar'. Sale. and Qutomcr Senice Department provide both pre-nle. <br />and aftcr-.~le. .upport with the loal of providinl a hilh delree of <br />cu.tomer .upport and .ati.faction. Qle.tion. and problem. arc an.wered al <br />.oon a. po..ible from telephone trouble .hootinl to computer bulletin board <br />.ervice.. Traininl and maintenance cla..e. arc held on a relular ba.il and <br />.pecial arranaaDent. for on .ite cu.taner traininl arc al.o available. <br /> <br />e') <br />'-..-r <br /> <br />28 <br />