My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06419
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:41 PM
Creation date
10/12/2006 1:36:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.150
Description
Grand Valley Unit - Colorado River Basin Salinity Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1982
Title
Monitoring and Evaluation Plan -- Colorado River Basin Salinity Control Program for Grand Valley Unit and Uinta Basin Unit, Utah -- PART I
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />( .J <br />C,J water agreed to in 1944 at the quality stanctard agreed to i.n 1975. Title I <br />".:.:,,4-1 <br />...~ of the Act includes reducing and treating drainage return flows from the <br /> <br />, <br />...' <br /> <br />I.:;'" <br /> <br />Wellton-Mohawk Irrigation and Drainage District near Yuma, l~izona. The <br /> <br />second canponent (Title II) deals with the salinity contribution in the river <br /> <br />above Imperial Dam and the program necessary to meet U.S. wa.ter quality <br /> <br />standards while the Basin States continue to develop their <br /> <br />compact-apportioned waters. <br /> <br />Specifically Title II of the Act authorized the construction operation and <br /> <br />maintenance of four salinity-control projects, including the Gral~ Valley <br /> <br />Unit; and the expeditious completion of planning reports on Ll other units <br /> <br />including the Uinta rlasin Unit. For tne Grand Valley Unit <br /> <br />Toe Secretary of <br /> <br />~r1culture is directed to cooperate in toe planning and construction of <br /> <br />onfarm system measures under programs available to that J)epartment." U;;UA <br /> <br />reports, which include a recommended plan to control salinity, were completed <br /> <br />for toe brand Valley and Uinta Units (See Figure I for location). USJ)A <br /> <br />implementation and installation of onfarm salinity control measures began in <br /> <br />1979 in Grand Valley. Installation of irrigation improvements to control <br /> <br />salinity began in 1980 in the Uinta Basin. <br /> <br />9 <br /> <br />1-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.