My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06410
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:39 PM
Creation date
10/12/2006 1:36:35 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.600.20
Description
Colorado River Interim Surplus
Basin
Colorado Mainstem
Date
1/1/2001
Author
USDOI/BOR
Title
Colorado River Interim Surplus Criteria Final EIS Record of Decision
Water Supply Pro - Doc Type
Record of Decision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Section 3. <br /> <br />Implementation of Guidelines <br /> <br />During the effective period of these Guidelines the SecretaI)' shall utilize the currently <br />established process for development of the Annual Operating Phn for the Colorado <br />River System Reservoirs (AOP) and use these Guidelines to make determinations <br />regarding Normal and Surplus condition<; for the operation of lake Mead and to <br />allocate apportioned but unused water. <br /> <br />The operation of the other Colorado River System reservoirs and determinations <br />associated with development of the AOP shall be in accordance with the Colorado <br />River Basin Project Act of I %8, the Guidelines, an:! other applicable federal law. <br /> <br />In order to allow for better overa II water management during the Inlerim Period, the <br />Secretary shall undertake a "mid-year review" pursuant to Section 1(2) of the LROC, <br />allowing for the revision of the current AOP, as appropriate, based on actual runoff <br />conditions which are greater than projected, or deman:!s which are lower than <br />projected. The Secretary shaD revise the determinalion for the current }ear only to <br />allow lOr additional deliveries. Anv revision in the AOP may occur only after a re- <br />initiation of the AOP consultation process as required by law. <br /> <br />. <br /> <br />As part of the AOP process during the effective period of these Guidelines, Califomia <br />shall report to the Secretary on its progress in implementing its Califomia Colorado <br />River Water Use Plan. <br /> <br />These Guidelines irnplem:nt Article III(3) of the LROC and may be reviewed <br />concurrently with the LROC 5-year review. The Secretary wiD base aroma! <br />determinations of sUlplus conditions on these Guidelines, unless extraordinary <br />circum;tances arise. Such circulrstances could include operations necessary for safety <br />of darns or other emergency situations, or other unanticipated or unforseen activities <br />arising from actual operating experience. <br /> <br />. <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.