My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06393
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:35 PM
Creation date
10/12/2006 1:36:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
2/17/2005
Title
Budget Ad Hoc Group-GCMRC FY06 Budget and Work Plan Development Question and Response Table
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TWG Budget Ad hoc Group <br />GCMRC FY 06 Non-Experimental Budget and Work Plan Development <br />QuestionlResponse Table <br /> <br />2 <br /> <br /> implementation in FY 2006, need to be fully resolved prior to the August 2005, <br /> AMWG meeting, <br /> Related to this planning effort, the 2006 workplan and budget should better <br />General 3 clarify what is proposed by GCMRC as core monitoring and what is proposed <br /> as research (also include a table ofID acronyms). Currently several elements <br />(Norm are specified as core monitoring in the workplan and budget but are not <br />Henderson) included in the 2006 provisional CMP (e.g., fine sediment storage and KAS). <br /> Some elements described in the workplan as core monitoring are actually a <br /> combination of core monitoring and R&D (e.g., downstream fish monitoring). <br /> Some elements are listed as core monitoring in the CMP are not listed as core <br /> monitoring in the workplan (e.g., survey and control). Some elements listed as <br /> core monitoring in botb the CMP and workplan have different budget amounts <br /> (e.g., Lees Ferry trout). Finally, some elements within the workplan are <br /> identified as core monitoring in the past but bave been terminated in '06 (e.g., <br /> Streamflow and SS transport) with no explanation. Below is a table that <br /> summarizes many of these inconsistencies. <br /> '06 Budget '06 Budget '06 '06 <br /> Item spreadsheet spreadsheet WPS Provisional <br /> Line # S CMPS <br /> Lake Powell <br /> Monitorine 158 215,250 215,250 445,500 <br /> Downstream WQ and <br /> sediment mass flux 62 1,1l3,373 1,113,373 I 104,000 <br /> Fine sediment storal!:e 63 294,688 294,688 Not in. <br /> Lees Ferry trout <br /> monitorine 90 118,450 118,450 184,000 <br /> KAS 87 221,260 221,260 Not in. <br /> Survey operations 130 148,523 148,523 100,000 <br /> Control network 132 176,813 176,813 100,000 <br /> Airborne RS 77 94,415 94,415 138,000 <br />GCMRC's The main reason there are inconsistencies between the FY06 budget and the FY06 <br />Response to core monitoring plan is because the definition of core monitoring is not static and <br />General has changed since the FY06 budget was prepared, Furthennore, the FY06 budget <br />Comment lacks sufficient funding flexibility to accomplish all the identified core monitoring <br />#3 elements for even the "green projects" that are not considered to be within the FY06 <br /> Provisional Core Monitoring Plan, We are addressing the discrepancies by including <br /> a paragraph and table within the FY06 Provisional Core Monitoring Plan that <br /> identifies the pieces of each project that will be funded in the FY06, The two <br /> projects previously described as "Streamflow and SS transport" and Downstream <br /> Quality of Water" have been integrated into one unified effort in the FY 2006 work <br /> plan and their budgets have both been reduced over the amounts that were approved <br /> in FY 2005. Including GCMRC salaries, the total of the combined FY06 project, <br /> now listed as "Downstream Quality of Water and sediment mass flux" is less than <br /> the total Core Monitoring components of the individual projects, plus associated <br /> salaries, as listed in the FY 2005 approved budget. It is only because the 001 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Document Reference: FY06 Master Draft AMP Budget - BOR GCMRC 02117/05 11 :05 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.