My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP06391
CWCB
>
Water Supply Protection
>
Backfile
>
6001-7000
>
WSP06391
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:22:34 PM
Creation date
10/12/2006 1:36:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.112.I
Description
Central Arizona Project
State
AZ
Basin
Colorado Mainstem
Date
5/21/1976
Title
Draft Environmental Statement: Orme Dam and Reservoir - Central Arizona Project
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />("":) <br />1"- <br />1"- <br />N <br /> <br />TABLE OF CONTENTS <br />(Continued) <br /> <br />c.:: <br /> <br />Page <br /> <br />(1) Alternative Considered for Salt River <br />Flood Control . . . . , . . . . . <br />(a) Channelization of Salt River <br />Through Phoen i x. <br />(b) Upstream Storage. . <br />(c) Flood Plain Management. <br />8. The Alternative of Action Postponement. <br />a. Loss of Water to Arizona.. . <br />b. Loss of Fl ood Contro 1. . . <br />c. Increased Cost of Future Construction. <br />d. Economi c Impacts .. . . . <br />e. Indian Reservation Development. " . <br />9. Alternative to Components of Proposed Action. <br />a. Alternate Dam Design. . . . . . . . : . <br />b. Fort McDowell Indian Community Relocation <br />Alternatives. . ....... <br />c. Recreation Development Alternatives. . . <br />(1) Separate Jurisdictional Management. <br />(2) Outside Agency Management . <br />(3) Combined Management. . . <br />d. Road Relocation Alternatives. . <br />(1) State Highway 87. .. .. <br />(2) Bush Highway. ..... <br />(3) Sheep Driveway and Crossing <br />e. Orme Canal Alternatives. .. <br />(1) Orme Granite Reef Canal. <br />(2) Granite Reef Aqueduct Extension Via <br />McDowell Mountain Tunnel. . . <br />f. Alternative Transmission Line Routes <br />(1) Tapping the Pinnacle Peak-Mesa 230kV <br />No.1 and No.2 Transmission Lines. <br />(2) Termination of Transmission Line into <br />Mesa Substation.. .. . <br />(3) Termination into Thunderstone <br />Substation. . . . . . . <br />(4) Underground Transmission Lines. <br />(5) Alternative Tower Structures. <br />g. Historic Resources - Fort McDowell <br />10. Operating Granite Reef Aqueduct at Full Design <br />Capac ity . . . . . . . ..... <br /> <br />348 <br /> <br />348 <br />350 <br />352 <br />352 <br />352 <br />353 <br />353 <br />353 <br />353 <br />353 <br />353 <br /> <br />354 <br />354 <br />354 <br />354 <br />355 <br />355 <br />355 <br />355 <br />356 <br />356 <br />356 <br /> <br />357 <br />357 <br /> <br />358 <br /> <br />358 <br /> <br />359 <br />359 <br />360 <br />360 <br /> <br />362 <br /> <br />;-: <br /> <br />;.-:- <br /> <br />xv <br />
The URL can be used to link to this page
Your browser does not support the video tag.