Laserfiche WebLink
<br />'r,;.., <br />rf:) <br /> <br />TABLE OF CONTENTS <br />(Continued) <br /> <br />- <br />!'-o <br />~ <br />~' <br /> <br />2. Sites Evaluated but Eliminated From Further <br />Consideration. '" <br />a. The Verde River Sites Above Bartlett Dam <br />and Reservoir. '" . . . <br />b. McDowell Dam Site. . . . . . . . <br />c. Reconstruction of Wadde11' Dam. . . <br />d. The North Phoenix Flood Control Sites--Corps <br />of Engineers Authorized Project. <br />(1) Cave Buttes Dam and Reservoir <br />(2) New River Dam and Reservoir <br />(3) Adobe Dam and Reservoir <br />(4) Summary.. " <br />e. Kl ondi ke Butte . <br />f. Wi!d Burro Mesa... .. <br />3. Alternative Plans Which Provide the Range of <br />Benefits Contemplated by the Authorizing Act. <br />a. Alternative l--Constructing a Multipurpose <br />Orme Dam at Confluence Site. .... <br />b. Alternative 2--Constructing Low Orme Dam at <br />Confluence Site With Flood Control Storage <br />Constructed at Horseshoe and Roosevelt <br />Reservoi rs. . . . <br />(1) Fort McDowell Indian Reservation. <br />(2) Biota . ..... . . . . . <br />(3) Historical and Archeological Resources. <br />(4) Impacts on Salt River Project. '" <br />c. Alternative 3--Construction of Multipurpose <br />Dam at the Granite Reef Site . .. '" <br />d. Alternative No. 4--Construction of Dam at <br />Granite Reef Site with Flood Control Storage <br />Constructed at Horseshoe and Roosevelt <br />Reservoi rs . .......... <br />4. Alternative Plans Evaluated With a Reduced Scale <br />of Development. . . . . . . . . . . <br />a. Alternative 5--0rme Dam at Confluence Site <br />Without Fl ood Contro 1. " " . <br />b. Alternative 6--Granite Reef Site Dam <br />Without Flood Control. '" <br />c. Alternative 7--Construction of Coon Bluff <br />With Flood Control Constructed at <br />Horseshoe and Roosevelt Reservoirs . <br />d. Alternative 8--Construct Coon Bluff Without <br />Flood Control. '" . " . <br />5. Alternative Plans Evaluated Which Were Eliminated <br />From Consideration '" . <br />a. Alternative 9--Construct Agua Fria and Coon <br />Bluff Dams--No Flood Control . <br /> <br />xiii <br /> <br />Page <br /> <br />301 <br /> <br />301 <br />302 <br />302 <br /> <br />303 <br />303 <br />304 <br />304 <br />305 <br />305 <br />305 <br /> <br />306 <br /> <br />306 <br /> <br />306 <br />308 <br />308 <br />309 <br />311 <br />311 <br /> <br />, <br /> <br />311 <br /> <br />:-1 <br /> <br />315 <br />315 <br />319 <br /> <br />," <br /> <br />319 <br /> <br />322 <br />322 <br /> <br />327 <br />