Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />of the studies and for a consolidated report after the five year period is <br />completed. <br /> <br />VI. Task Description (FY-1994) <br /> <br />Ongoing <br /> <br />Task 1, Annual assessment of Colorado squawfish reproduction and larval <br />fish abundance in the Colorado and Gunnison rivers, <br /> <br />Task 2. Availability and quality of nursery habitat for Colorado <br />squawfish in the Colorado River. <br /> <br />Task 3, Evaluation of Colorado squawfish recruitment. <br /> <br />Task 4. Over-winter survival of age-O Colorado squawfish, <br /> <br />Task 5. Evaluation of the link between recruitment of young Colorado <br />squawfish and recruitment to adult stocks. <br /> <br />Task 6. Annual assessment of reproduction and abundance of selected non- <br />native fishes. <br /> <br />Task 7. Determine status of endangered fishes in the Gunnison River above <br />Redlands Diversion Dam, <br /> <br />Task 8. Annual assessment of humpback chub reproduction in Westwater <br />Canyon. <br /> <br />Task 9. Quantify the quality and quantity of general habitat types in the <br />Gunnison River. <br /> <br />Begin in FY 94 <br /> <br />Task 10. Annual assessment of humpback chub reproduction in Black Rocks. <br /> <br />Task 11, Quantify flows necessary for channel maintenance, substrate <br />cleaning, and nursery habitat maintenance. (Funded outside the <br />Recovery Program) <br /> <br />Task 12. Establish the relationship between geomorphology of river system <br />and fish habitat, and how these factors influence the <br />distribution of the endangered fishes. (NOTE: Aspinall working <br />group decided this was an important missing element in the <br />current studies and suggested adding this task in FY-94) <br /> <br />VII. Study Schedule <br /> <br />FY 92 throu2h FY 96 <br /> <br />Fiscal Year <br /> <br />92 <br /> <br />93 <br /> <br />94 <br /> <br />95 <br /> <br />96 <br /> <br />97 <br /> <br />5 <br />