Laserfiche WebLink
<br />DO.! FT (.jLL~N:O <br /> <br />Del1vel"ables: <br /> <br />Budget: <br /> <br />B. FY 1995 Work: <br /> <br />Description: <br /> <br />Dallverablu: <br /> <br />Budge t: <br /> <br />C. FY 1996 Work: <br /> <br />D..cript:l.on: <br /> <br />Oellvllrablu: <br /> <br />Budget: <br /> <br />D. FY 1997 Work: <br /> <br />De.cription: <br /> <br />TEL:3(i3-4~C-2621 <br /> <br />Fipr 28 93 <br /> <br />13:19 NO.aCe P.85 <br /> <br />. <br /> <br />. <br /> <br />Correlata to flow and temperature regime <br />v~riables fol" 1992-1994. <br /> <br />Annual progress report (12/15/94). <br /> <br />Tasks 1-3: Labor: Wildlife Researcher <br />Utility Workal" (6) <br /> <br />$ 18,510 <br />8,490 <br /> <br />Travel and per diem: 4,700 <br />Maintenance and Operation: <br />Vehicle. (1 4vd truck @ <br />1000 ~i/trip and $O.25/mi) 500 <br />(1 4wd truck @ 100 mi/day <br />and $0. 25/lIi) 800 <br />Sampla processing, idllnt. <br />(30 daye, 5 stations, 2 <br />samplea/aita @ $38/.ample) 11,400 <br /> <br />~~1 $".~O <br /> <br />Tasks 1-3: larval drift sampling. 30-day sample <br />in July, 4 aites. Acquire relevant data froll <br />nursery habitat study and standardized fall <br />aaining in study reach for comparisons. <br />Corralaee to flow and temperatura regime <br />variables for 1992.1995. <br /> <br />Annual progrees report (12/15/95) <br /> <br />Taaka 1-3: $42,200 <br /> <br />Tasks 1-3: larval drift sampling. 30-day sample <br />in July, 4 sites. AcquIre relevant data frail <br />nuraery habitat study and standardized fall <br />aaining in etudy reech for cOllparisona. <br />Correlate to flow and teaperatura regime <br />variablea for 1992-1996. <br /> <br />Annual progreee report (12/15/96), ovaluation of <br />sxiating larval production by wild flah. <br /> <br />TRaka 1-3: s~ as FY 1995 <br /> <br />Taska 1-3: Evaluation of 1992-1996 data for larval <br />production and .pavnll\& pottmt1al in occupied reach; <br /> <br />4 <br />