Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />I. Characterize present fish community, including endangered fish in <br />in the Gunnison River, confluence with the North Fork of the <br />Gunnison to confluence of the Colorado River with methodologies <br />that will allow comparison to past survey data (USFWS, 1979-81, <br />CDOW 1977-82). <br /> <br />2. Evaluate potential spawning of Colorado squawfish in the Gunnison <br />River above Redlands Diversion Dam utilizing radiotelemetry <br />studies. <br /> <br />IV. Study Area (river miles and sampling dates, if appropriate) <br /> <br />Gunnison River from confluence with the Colorado River to the confluence <br />with the North Fork of the Gunnison (river mile 0-75). <br /> <br />V. Study Methods/Approach <br /> <br />Conduct extensive sampling using electrofishing, entanglement netting, <br />trap netting, and seining, etc. to collect fish. This effort will be <br />combined with the USFWS effort to locate and evaluate previously stocked <br />fish in the Gunnison River. This will not only reduce costs but also <br />minimize sampling effort to accomplish both objectives. <br /> <br />Compare numbers, length-frequency distribution and location to survey <br />data collected in the Gunnison River 10 years ago. <br /> <br />PIT ta9 and collect tissue samples for genetic analysis from all juvenile <br />and adult endangered fish collected. In addition adult Colorado <br />squawfish will be radio-tagged to monitor movement and evaluate potential <br />spawning activity. <br /> <br />VI. Task Description (FY-1994) <br /> <br />Task I. Monitor radio-tagged adult Colorado squawfish throughout the <br />winter or until radio transmitter signals expire. <br /> <br />Task 2. Input field data into d-BASE; analyze summarize findings; <br />compare present study findings with past fishery survey and <br />inventory data; prepare draft and final report. <br /> <br />VII. Study Schedule (start/end by Task) <br />Task I. 4/92~10/92; 4/93~10/93 <br />Task 2. 4/92~10/92; 4/93~10/93 <br />Task 3. 4/92~7/94 <br />Task 4. 10/93~7/94 <br /> <br />2 <br />