Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />to <br />t"- <br />oo <br />c.j <br /> <br />n <br />" <br />I' <br />I: <br />ii <br />I <br /> <br />45 <br /> <br />", <br /> <br />MR. BRANTINGHfu~: -- to allow more water to <br /> <br />c <br />- <br /> <br />" <br />" ,I <br />-:i accumulate? <br /> <br />II <br /> <br />:1 <br />! <br />,i flow through. <br />i, <br /> <br />MR. FREENY: To allow a lot more water to <br /> <br />i, <br />" <br /> <br />MR. BRfu~TINGHN1: Oh, okay. <br /> <br />A VOICE: To accumulate water in the Gate <br /> <br />. <br /> <br />Rock Dam. <br /> <br />MR. BRANTINGHAM: But we can let more water <br /> <br />through, is that correct? <br /> <br />MR. FREENY: That's correct. <br /> <br />i' <br />, <br /> <br />A VOICE: The reason they lower the water -- <br /> <br />':r; <br /> <br />PRESIDING OFFICER: I I d like to <J.!t you all <br /> <br />at the microphone. <br /> <br />....,I <br /> <br />I I <br /> <br />,I <br /> <br />MR. BRANTINGHN1: Well, I'll sit down in a <br /> <br />",' second-- <br /> <br />\1 <br />'j <br />I <br />y. <br /> <br />PRESIDING OFFICER: No, I didn't mean that. <br /> <br />HR. BRANTINGHAM: -- but what I'm leading up <br /> <br />.i <br /> <br />to is \,hy can I t we coordinate the additional outflow with <br /> <br />;11,1 <br /> <br />letting more water through Ileadgate -- <br /> <br />HR. GARNER: lIeadgate? The level at Headgate <br /> <br />Rock Dam stays at the same level if there's two thousand <br /> <br />(2,000) cfs of water running through the River -- <br /> <br />,I <br />i: <br />" <br />I, <br />" <br />" <br /> <br />MR. BRANTINGHAM: Right. <br /> <br />~lR. GARNER: -- or a hundred thousand (100,000) <br /> <br />..". <br /> <br />cff; -- <br /> <br />-'-- -.--_.- -.-.----...-.-.- -_._~.--.__._-~--------- <br />